QRL kick-off meeting Presentation of the cryogenic extensions for the QRL project. A. Bouillot - AT/ACR 20.10.2005. Content. Introduction Type, location and numbers Activities supplied by Air Liquide Components, external supports, interconnections, … Documentation and drawings
E N D
QRL kick-off meetingPresentation of the cryogenic extensions for the QRL project A. Bouillot - AT/ACR 20.10.2005
Content • Introduction • Type, location and numbers • Activities supplied by Air Liquide • Components, external supports, interconnections, … • Documentation and drawings • Engineering design • Main issues and status (external supports and cryogenic extensions elements) • Fabrication • Main issues and status (external supports, cryogenic extensions elements, conditioning and tests) • Installation • Main issues and status (external supports, transport, positioning and adjustment of the elements, leak tests, …) • Schedule and planning A. Bouillot, AT/ACR-cd, 2005.10.20
Introduction • A cryogenic extension allows to link the QRL jumpers to different clients (DFBA, DFBL, Q6, ACS). • The diameter of the cryogenic extensions is 355.6 mm A. Bouillot, AT/ACR-cd, 2005.10.20
Introduction • They are composed of several interconnection pipes (between 4 and 9 pipes) with different internal diameters (from 10 mm to 80 mm) Interface of the cryogenic extension element QRLXD (sector 8-1) Interface of the cryogenic extension element QRLXE (sector 8-1) A. Bouillot, AT/ACR-cd, 2005.10.20
Introduction • Type, number and location • Different designs : • Straight elements about 3m with diameter 355 mm • Elbow elements about 2.5x2.5 m2 each • Weight : ~ 80 kg/m A. Bouillot, AT/ACR-cd, 2005.10.20
Activities supplied by Air Liquide • External supports • Design • Procurement • Transport to CERN • Elements : • Design, fabrication, conditioning • Transport to CERN • Interconnections • Design • Procurement of the different components: vacuum jackets, MLI A. Bouillot, AT/ACR-cd, 2005.10.20
Documentation • Drawings associated with each cryogenic extension • All Drawings are available on the AT/ACR-cd server : • \Srv2_div\CRYO\ACR-CD\Projects\QRL\Drawings\Plans TIF-PDF AL\cryo extensions\ A. Bouillot, AT/ACR-cd, 2005.10.20
Engineering design • Straight and elbow pipes are in Invar material • The extremities of each interconnection pipes are equipped with Stainless Steel sleeves • Most of cryogenic extensions have no active thermal shield. Each interconnection pipe is equipped with MLI. Only cryogenic extensions QRLXF and QRLXH (linking ACS) have active thermal shield. • The vacuum jacket is in Stainless Steel. • The number of elements composing one cryogenic extension can vary from 1 to 4 elements. • Interconnection pipes are supported inside the vacuum jacket with spacers • The thermal losses per meter is around equal to ~ 1.5 W/m. • External interconnections are made with rigid sleeves. • Horizontal cardan compensator on QQS jumper side. • Flexible hoses are added on Q6 and DFBA side for the cryogenic extensions QRLXD, QRLXA, QRLXC, QRLXK and QRLXL. A. Bouillot, AT/ACR-cd, 2005.10.20
Engineering design • Status A. Bouillot, AT/ACR-cd, 2005.10.20
Fabrication • Main issues • The fabrication takes place at DTA (Air Liquide-Sassenage). • Each interconnection pipe (Invar) is He tested after the prefabrication. • The possible weld interfaces can be : • Stainless Steel / Invar • Invar / Invar • Each weld is X-rayed (norm EN 25817-Class B) and have associated qualifications • Each cryogenic extension undergoes the following tests : • Pressure test • He test • Cold test A. Bouillot, AT/ACR-cd, 2005.10.20
Fabrication Cryogenic extension HCQRLXE100-AL000001 • QRLXE Element HCQRLXE103-AL000001 Element HCQRLXE102-AL000001 Element HCQRLXE104-AL000001 Element HCQRLXE101-AL000001 A. Bouillot, AT/ACR-cd, 2005.10.20
Fabrication • QRLXD Cryogenic extension HCQRLXD100-AL000001 A. Bouillot, AT/ACR-cd, 2005.10.20
Fabrication • Status • HCQRLXE100-AL000001 85% • 3 elements (HCQRLXE101-AL000001, HCQRLXE102-AL000001, HCQRLXE103-AL000001) are already fabricated (succeed in the cold test) • HCQRLXE104-AL000001 is prepared for the tests • HCQRLXD100-AL000001 70% • HCQRLXD100-AL000001 is under fabrication (installation of the vacuum jacket) • Others 0% A. Bouillot, AT/ACR-cd, 2005.10.20
Fabrication • Cryogenic extension QRLXE Element HCQRLXE101-AL000001 Element HCQRLXE103-AL000001 A. Bouillot, AT/ACR-cd, 2005.10.20
Fabrication • Cryogenic extension QRLXE Element HCQRLXE101-AL000001 Element HCQRLXE102-AL000001 Element HCQRLXE103-AL000001 A. Bouillot, AT/ACR-cd, 2005.10.20
Fabrication • Cryogenic extension QRLXD Element HCQRLXD100-AL000001 A. Bouillot, AT/ACR-cd, 2005.10.20
Fabrication • Conditionnement • Double housse thermo soudable • Mise en place de l'élément dans la première housse • Soudage de la housse • Avant fermeture de celle ci balayage azote (mesure hygrométrie) • Mise sous vide de l'enveloppe (à l'aspirateur) • Fermeture de l'enveloppe • Scellement de la 2eme housse avec déshydratant • La 2eme housse sera réalisée avec un complexe épais et résistant • L'ensemble conditionné sous housse est posé sur un plateau de type habituel. A. Bouillot, AT/ACR-cd, 2005.10.20
Installation • External supports for HCQRLXD100-AL000001: Supports C1105S285 Supports C1105S286 A. Bouillot, AT/ACR-cd, 2005.10.20
Installation • External supports C1105S286: A. Bouillot, AT/ACR-cd, 2005.10.20
Installation • External supports C1105S285: A. Bouillot, AT/ACR-cd, 2005.10.20
Installation • External supports for HCQRLXE100-AL000001: Support C1105S381 Support C1105S382 A. Bouillot, AT/ACR-cd, 2005.10.20
Installation • External supports C1105S381: A. Bouillot, AT/ACR-cd, 2005.10.20
Installation • External supports C1105S382: A. Bouillot, AT/ACR-cd, 2005.10.20
Installation • Activities supplied by CERN • Handling • Transport CERN/tunnel with dedicated tooling • Positioning and adjustment • Interconnections : • welding : same interface type as standard jumper connection (+ leak tests associated) • Installation of rings and sleeves : • D < 30 mm rings • D ≥ 30 mm sleeves • MLI : 30 layers on each interconnection pipe • Welding of external rigid sleeve A. Bouillot, AT/ACR-cd, 2005.10.20
Installation • Activities supplied by CERN • Interconnections : Rings for diameter pipes 10/12 mm Sleeves A. Bouillot, AT/ACR-cd, 2005.10.20
Schedule and planning • Planning (supplied by R. Girardot on 19.10.2005) A. Bouillot, AT/ACR-cd, 2005.10.20
Cryogenic extensions project • Link person for AT/ACR : A. Bouillot • Link person for other activities : to be defined • Periodic meetings : every two weeks ??? • Proposed subject for next meeting: finalization of organization A. Bouillot, AT/ACR-cd, 2005.10.20