20 likes | 131 Views
Preparation of WP5D Seoul meeting 25 th September, 2008. Juyeon Song. TTA Preparation of WP5D. Candidate contributions Spectrum WG 2.3GHz freq. arrangement of AWF (multi-country proposal) Modification of M.1036 update workplan Changing target date to the end of 2009 Technology WG
E N D
Preparation of WP5D Seoul meeting 25th September, 2008 Juyeon Song
TTA Preparation of WP5D • Candidate contributions • Spectrum WG • 2.3GHz freq. arrangement of AWF (multi-country proposal) • Modification of M.1036 update workplan • Changing target date to the end of 2009 • Technology WG • Modification of TDT (technology Description Template) • Revision of Evaluation Report • Service WG • Revision of Long range WP5D work plan TTA consider in-depth discussion technology WG items in this CJK meeting.