1 / 26

NSD Update

NSD Update. James Symons 9/14/09. 88-Inch Cyclotron / Accelerator Based Nuclear Science News. Element 114 Confirmation Fixed Vacuum Leak in “D” - July 2009 $1.88m ARRA Funding Move to different RF Tube Intensity Upgrade with new Injection System

colm
Download Presentation

NSD Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NSD Update James Symons 9/14/09

  2. 88-Inch Cyclotron / Accelerator Based Nuclear Science News • Element 114 Confirmation • Fixed Vacuum Leak in “D” - July 2009 • $1.88m ARRA Funding • Move to different RF Tube • Intensity Upgrade with new Injection System • Signature of Extension of MOA through 2015 Imminent • GRETINA Installation has started in Cave 4C • Capital equipment ($900k) • DOE and MSU signed cooperative agreement to build FRIB (completion around 2017/18) • Two meetings: Rare Isotope Summer School, JUSEIPEN

  3. Historic Repair of 88-Inch Cyclotron’s Suspended Two-Ton Cover Plate By Jim Morel 7/31/09

  4. 88-Inch Cyclotron / Accelerator Based Nuclear Science News • Element 114 Confirmation • Fixed Vacuum Leak in “D” - July 2009 • $1.88m ARRA Funding • Move to different RF Tube • Intensity Upgrade with new Injection System • Signature of Extension of MOA through 2015 Imminent • GRETINA Installation has started in Cave 4C • Capital equipment ($900k) • DOE and MSU signed cooperative agreement to build FRIB (completion around 2017/18) • Two meetings: Rare Isotope Summer School, JUSEIPEN

  5. Started at the 88” Cyclotron System Assembly Support structure in Cave 4C NSCL User Workshop

  6. 88-Inch Cyclotron / Accelerator Based Nuclear Science News • Element 114 Confirmation • Fixed Vacuum Leak in “D” - July 2009 • $1.88m ARRA Funding • Move to different RF Tube • Intensity Upgrade with new Injection System • Signature of Extension of MOA through 2015 Imminent • GRETINA Installation has started in Cave 4C • Capital equipment ($900k) • DOE and MSU signed cooperative agreement to build FRIB (completion around 2017/18) • Two meetings: Rare Isotope Summer School, JUSEIPEN

  7. Challenges • Short term • Get VENUS Running • Prepare for GRETINA RUN in 2011 • Reinvigorate Trapping Program • Medium term • “Heavy Element Upgrade” • Injection AIP Project • BGS Focal plane: gas stopper • Detector Upgrades • Long Term • Replacement of the 88

  8. Small Digression • Sometimes you get what you ask for, although it may take a little longer than expected; • 2001 NSAC Long range plan laid out a broad vision for the field: important questions, big plans • 2001 • RIA $1BN 2012 • Jlab 12GeV Upgrade $160M 2008 • DUSEL $130M 2009 • RHIC II $100M 2010 • (eRHIC) circa 2015

  9. Small Digression • Sometimes you get what you ask for, although it may take a little longer than expected; • 2001 NSAC Long range plan laid out a broad vision for the field: important questions, big plans • 2001 2009 • FRIB $1BN 2012 $550M 2018 • Jlab 12GeV Upgrade $160M 2008 $350M 2014 • DUSEL $130M 2009 >$1B 2017 • RHIC II $100M 2010 $80M 2014 • (eRHIC) circa 2015 After 2020

  10. Drivers for Accelerator-based LENP program in next 8 years • FRIB Construction • FRIB Instrumentation • Isotope Production Program

  11. Neutrinos, etc. • DUSEL Progress • Project Office on Campus • NSF S4 Awards • DIANA • Majorana • CUORE • Prototype Crystals look great • CD2/3 imminent • KamLAND • Purification for Solar Neutrino Phase going well • DUSEL Science Report

  12. Solving the Solar Neutrino Problem SNO ~1 kton D2O water Cherenkov 6 kmwe overburden KamLAND ~1 kton mineral oil scintillation 3 kmwe overburden

  13. Solar Physics with Neutrinos

  14. Challenges • Short Term • Data taking for Kamland Solar Phase • “CD-1” for Majorana “Demonstrator Project” • Start Construction Phase of CUORE • Medium Term • CUORE • Technical design of DIANA • Demonstrator at Sanford Lab • Long Term • DUSEL Experiments

  15. Another Digression • If DUSEL goes ahead, it will be focus of activity for US groups: • Long baseline neutrino experiments • Dark Matter Searches • Neutrinoless double-beta decay • Nuclear Astrophysics • . . .

  16. Nuclear Theory News • Spin Workshop • New Arrival - Wick Haxton, Joint Appointment with UCB • Submitted materials for DOE Program Review • Submitted two topical center proposals: • Quantitative Jet and Electromagnetic Tomography (JET) of Extreme Phases of Matter in Heavy-ion Collisions, • XN Wang, B Mueller, PIs • Nuclear Physics and Nuclear Astrophysics through high performance computing • W. Haxton, G. Fuller PIs

  17. Challenges • Short Term • Catching their breath • Medium Term • Topical Center(s) • Long Term • Computational End Station

  18. RNC News • Long polarized proton run completed, including first data at 500Gev • DOE/BNL proceeding with Heavy Flavor Tracker • Four calorimeter modules installed in ALICE • Interviews for open positions

  19. RNC News • Long polarized proton run completed at RHIC, including first data at 500Gev • DOE/BNL proceeding with Heavy Flavor Tracker • CD1 Review in November • Four calorimeter modules installed in ALICE • 4/11 of Calorimeter for first running • Scientific case for additional modules • Interviews for open positions

  20. Challenges • Short term • ALICE Computing at PDSF and LLNL • New Hires • RHIC Low Energy Scan • Medium Term • Physics with HFT, ALICE • Long Term • EIC, or…

  21. Challenges • Short term • ALICE Computing at PDSF and LLNL • New Hires • RHIC Low Energy Scan • Medium Term • Physics with HFT, ALICE • Long Term • EIC, or…

  22. Digression • Directors Review Report is on its way • Division’s Program Outstanding • Observation • Spread rather thin • Recommendations • New Chemistry faculty • New Staff in Low Energy

More Related