Greg Brooks Geological Survey of Canada Natural Resources Canada

The July 1996 floods in the Saguenay Valley, Quebec, Canada: a case study of the effects of extreme flooding. Greg Brooks Geological Survey of Canada Natural Resources Canada. Purpose of talk. Overview the regional setting and cause of the 1996 Saguenay flood disaster

colman
Download Presentation

Greg Brooks Geological Survey of Canada Natural Resources Canada

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The July 1996 floods in the Saguenay Valley, Quebec, Canada: a case study of the effects of extreme flooding Greg Brooks Geological Survey of Canada Natural Resources Canada

  2. Purpose of talk • Overview the regional setting and cause of the 1996 Saguenay flood disaster • Highlight geomorphic effects and impacts of flooding along four Saguenay area rivers: • Chicoutimi and Sables rivers - small dams • Mars River - planform transformation • Ha! Ha! River - dam breach–rainstorm flood • Summarize mitigation implemented in response to the flood disaster

  3. Saguenay area

  4. Canadian Shield • Bedrock terrain with thin, generally discontinuous cover of glacial deposits • Drainage courses: • Deranged by Laurentide Glaciation • Locally controlled by bedrock and glacial deposits reflecting deglacial history • Channels morphology vary locally from alluvial, ‘semi-alluvial’ and bedrock • Channel gradients irregular (substrate changes) • Drainage basins contain numerous small lakes

  5. 3500 km2 608 km2 660 km2

  6. July 1996 Rainstorm

  7. An extreme flood! • Lake Kénogami - source of Sables and Chicoutimi rivers • Inflow into the reservoir (3390 km2) • previous max. April 1941 – 997 m3s-1 • 100-yr flow (1912-1995) – 973 m3s-1 • 10 000-yr flow (1912-1995) – 1437 m3s-1 • max. inflow July 21, 1996 – 2364 m3s-1 (Source: Nicolet Commission Report 1997)

  8. Sables and Chicoutimi rivers

  9. 1100 m3s-1 653 m3s-1 Flood hydrograph

  10. Flood hydrograph

  11. Jonquière dam - Sable River Built in 1943

  12. Chute-Garneau dam - Chicoutimi River Built in 1925

  13. and two additional dams! Chute-à-Besy dam (1911) Pont-Arnaud dam (1912)

  14. Other dams Ville-de-Jonquière dam (1996) Chicoutimi dam (1923) Elkem- Métal Dam (1958)

  15. Problems at run-of-the-river dams • Inadequate spilling capacity at the dams: • Flood exceeded maximum operating spilling capacity of 6 of 7 dams • Maximum operating spilling capacity not available at 7 of 7 dams • sluice gates not all opened (maintenance) • sluice gates malfunction/damaged during flood • sluices obstructed by flooding debris

  16. Problems elsewhere • Primarily inundation of low-lying areas • Scouring of vegetation along steep bedrock reaches

  17. Chicoutimi - Sables rivers conclusions • ‘Older’ small dams may have an insufficient maximum spilling capacity • Maximum spilling capacity may not be available during an extreme flood • Uncontrolled overtopping of abutment areas can result in reservoir breaching and loss of dam function • Erosion and overtopping flows can caused ‘collateral’ damage to nearby buildings even where these are situated above flood levels

  18. Mars River study area • Alluvial, irregular meander planform (sinuosity 1.2) • Gravel-bed channel • Valley gradient averages 0.012 • River occupies deep stream-cut valley 300 to 1200 m wide • Storm-generated flood discharge (i.e, not influenced by dam breaches)

  19. Pre-flood (May 1994) Pre-flood

  20. Pre-flood (May 1994) Post-flood

  21. Change in total channel width

  22. Post-flood channel

  23. Impacts on infrastructure

  24. A transitional meandering planform

  25. Empirical planform discriminate diagram

  26. Empirical planform discriminate diagram

  27. Empirical planform discriminate diagram

  28. Mars River conclusions • Storm runoff caused large-scale valley bottom erosion • Pre-flood channel represents a transitional meandering planform • Inferred from empirical Q-s equations that pre-flood channel was at or close to the braided zone of planform types • Large-scale channel widening during 1996 flood represents the transformation from a transitional meandering to braided planform • Expected that there would be a post-flood recovery of the channel to a transitional meandering planform

  29. Ha! Ha! River flood • Most severe flooding in region occurred along Ha! Ha! River • Flood accentuated due to dyke breach at Lake Ha! Ha! • 35 km of valley affected by resulting flood • Important to consider breach from the context of the problems with dams along Sables and Chicoutimi rivers La Baie

  30. Pre-flood Lake Ha! Ha! Inflow – 160 m3s-1 Max. spilling capacity – 250 m3s-1 Avail. spilling capacity – 86 m3s-1

  31. Post-flood Lake Ha! Ha!

  32. Estimates of flood discharge

  33. Downstream geomorphic effects

  34. Downstream geomorphic effects

  35. Downstream geomorphic effects

  36. Downstream geomorphic effects

  37. Transition from deposition to erosion

  38. Erosive threshold

  39. Erosive threshold Below threshold

  40. Moderate widening

  41. Large-scale widening - lower reach

  42. Geomorphic effects - bedrock reaches Downstream view Upstream view

  43. Large-scale avulsion

  44. Large-scale avulsion

  45. River mouth • 9.3M m3 of sediment transported to tidal flats and Saguenay fjord

  46. Ha! Ha! River conclusions • Flood accentuated by erosion of an earthfill dyke and incision of underlying cohesive glacial deposits • Estimates of flood discharge range between 900 and 1380 m3s-1 • 300 Wm2 is a useful threshold to discriminate between reaches of large-scale erosion and deposition • Pre-flood valley morphology and valley bottom materials are important controls on channel widening • An avulsion caused the bypassing of a bedrock control of local base level resulting in the large-scale river incision

  47. Mitigating a future disaster • Many area dams were replaced or upgraded to accommodate more extreme discharges • Changes were made to the operating procedures of individual dams • Legislation (Bill 93 – Dam Safety Act) passed that improves the regulation, operation and maintenance of dams in Quebec • especially small dams (< 15 m) Jonquière dam

  48. Mitigating a future disaster • Floodplains • 65 km of floodplains ‘sterilized’ through buyouts/expropriations of property owners • floodplain re-mapped incorporating the July 1996 discharge (20-yr flow; 100-yr flow) • floodplain zoning considered bank erosion Below Chicoutimi dam

  49. Acknowledgements • T. Lawrence, C. Bégin, D. Perret (GSC) • Office of Critical Infrastructure Protection and Emergency Preparedness Canada • Canada Centre for Remote Sensing • Quebec Ministry of Public Security • Abitibi Consolidated Inc. • SNC Lavalin New dam and dyke at Lake Ha! Ha!