1 / 10

Fullerton College Physical Education Project

Fullerton College Physical Education Project. Community Meeting March 11, 2009. Discussion Items. Community Concerns Initial Study – CEQA Requirements Status of Project Lighting Bleachers Sound System Traffic Project Phases Project Budget. N. BERKELEY AVE. Phase 1 Olympic Pool

conley
Download Presentation

Fullerton College Physical Education Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fullerton CollegePhysical Education Project Community Meeting March 11, 2009

  2. Discussion Items • Community Concerns • Initial Study – CEQA Requirements • Status of Project • Lighting • Bleachers • Sound System • Traffic • Project Phases • Project Budget

  3. N. BERKELEY AVE. • Phase 1 • Olympic Pool • 50 Meter Pool Replaces • Old 25 Meter Pool • 1 Meter and 3 Meter • Springboards • Pool Pump House • Building • Fire Pump Building • Serves as Additional • Fire Protection to Campus • Tennis Courts • Refurbished • New Fire Lane N. LEMON ST. N. BERKELEY AVE. FIRE LANE E. CHAPMAN AVE. Fullerton College Athletics Project

  4. Phase 2A • Artificial Turf Fields • Football, Soccer and • Track and Field per NCAA • Standards • 1,500 Seat Home Bleacher & • Pressbox • 500 Seat Visitors Bleacher • Six 100 ft. Light Poles with • Directional Reflectors • 76.6 footcandles for games • (30 footcandles for simple use) • 0.6 footcandles at 100 ft east • (1.5 footcandles on vertical) • 0.16 footcandles at 150 ft east • ( 0.5 footcandles on vertical) • Fieldhouse • 20,000 sf / 2 Stories • Locker Rooms/Training • Field Support Services • 3 Classrooms • 10 Offices • 6 Workstations • Roof Plaza Assembly • Space (1,800 sf) • 60 New Parking Stalls Level 2 Level 1 N. BERKELEY AVE. N. LEMON ST. N. BERKELEY AVE. Light Pole Reflectors E. CHAPMAN AVE. Fullerton College Athletics Project

  5. Phase 2C • Dance Studio • New Lighting and A/C • Refinished Floors and Paint • Corridors • New Lighting, Floors, and Paint • Restrooms • Storage • Phase 2B • South Gym • New Lighting and A/C • Refinished Floors, Paint • Refurbished Basketball Equipment • Women’s Locker Room • New Lighting and Ventilation • Refurbished and New Showers • New Dedicated Team Rooms • New Bathrooms • Coaches Locker Rooms • Officials Changing Rooms • Equipment Storage Fullerton College Athletics Project

  6. Phase 2E • Outdoor Sports Court • New Sand Volleyball Pit • New Basketball Half-Court • Refurbished Strength Lab • Expanded Training Facilities • New Circuit Lab • Phase 2D • North Gym • New Power Retractable Bleachers w/Assistive Listening • Refinished Floors • New Lighting and A/C • Mezzanines • Renovated for Multi-Purpose Use • New Lights, A/C & Paint • (16) Offices & (2) Meeting Spaces • New Storage • Men’s Locker Room • New Lighting and Ventilation • New Lockers • Refurbished and New Showers • New Dedicated Team Rooms • New Bathrooms Fullerton College Athletics Project

  7. N. BERKELEY AVE. • Additional Work • Playing Field • Bleachers/Pressbox • Jump Events • Signage • Throwing Field • Doors • Security • Access Hardware • Value Engineering • Dance Studio • Floor Repair • Ballet Bars • South Gym • Bleachers N. LEMON ST. N. BERKELEY AVE. E. CHAPMAN AVE. Fullerton College Athletics Project

  8. Project Cost