1 / 18

Next Generation Air Transportation System

Next Generation Air Transportation System. Presentation to the Commercial Space Transportation Advisory Committee (COMSTAC) May 26, 2005. Robert A. Pearce Deputy Director Joint Planning & Development Office. Outline. Background 2025 Concept for “Block-to-Block” Aircraft Operations

conley
Download Presentation

Next Generation Air Transportation System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Next Generation Air Transportation System Presentation to the Commercial Space Transportation Advisory Committee (COMSTAC) May 26, 2005 Robert A. Pearce Deputy Director Joint Planning & Development Office

  2. Outline • Background • 2025 Concept for “Block-to-Block” Aircraft Operations • Private Sector Involvement / NGATS Institute • Schedule

  3. Establishes National Goals Sets context for Transformation Sets direction for Transformation (8 Transformational Strategies) Creates governance model for multi-agency cooperation Delivered to Congress in December, 2004 Cleared through the Administration Signed by the Secretary of Transportation and the FAA Administrator Integrated National Plan Download .pdf version of the plan at www.jpdo.aero

  4. Inter-agency Governance • Senior Interagency Policy Committee • Guides and approves the National Integrated Plan • Joint Planning and Development Office (JPDO) • Develops and oversees implementation of the National Integrated Plan • Inter-Agency Integrated Product Teams • Develops and oversees implementation of Action Plans

  5. The Integrated Product Teams • Develop Airport Infrastructure to Meet Future Demand - FAA • Establish an Effective Security System without Limiting Mobility or Civil Liberties - DHS • Establish an Agile Air Traffic System - NASA • Establish User-specific Situational Awareness - DOD • Establish a Comprehensive Proactive Safety Management Approach - FAA • Environmental Protection that Allows Sustained Aviation Growth - FAA • Develop a System-wide Capability to Reduce Weather Impacts – DOC/NOAA • Harmonize Equipage and Operations Globally - FAA

  6. Outline • Background • 2025 Concept for “Block-to-Block” Aircraft Operations • Private Sector Involvement / NGATS Institute • Schedule

  7. 2025 Concept for “Block-to-Block” Aircraft Operations

  8. 2025 NGATS Capabilities “Block to Block” • Global Secure Access to Net Centric Information • Airborne Information Web • Broad-Area Precision Navigation • Required Total System Performance – Equip for Service • National Dynamic Airspace • 4D Trajectory Management • Seamless Weather Assimilation Into Decision Loops • Equivalent Visual Operations • Super Density Operations • Distributed Airport Operations

  9. National Dynamic Airspace • Airspace configuration driven by user needs, national security requirements, safety, overall efficiency of operations • Single mechanism for implementing SUA, TFR’s, etc. • Applying resources where the demand warrants • Reconfigurable hourly

  10. Management-by-Trajectory • Users have 4D trajectories which are the basis for planning and execution • 4D trajectories exchanged and conflicts resolved among users and ATM service providers – “The Evaluator” • Strategic traffic management and separation assurance

  11. “Equivalent Visual” Operations • Enable aircraft to “see” operations in non-visual conditions • Allow controllers to delegate “maintain separation” function to aircraft • Independent operations to converging and closely-spaced parallel runways • System-wide availability at all “air portals”

  12. Weather Information in ATM System • Stable fusion of weather observations and forecasts from multiple sensors and prediction models into one national database • Dynamic updating and support for all push/pull operations • Seamless assimilation of weather information in ATM system “decision loops”

  13. EVALUATOR User Plans Data Base ANSP Plans Data Base Scheduling Automation “Block to Block” Concept: Selected Elements Communication Constellation Navigation Constellation SatComm Constellation (Data & Voice Digital Comm) Aeronautical Information & Block-to-Block 4-D Trajectory SatNav Constellation (Positioning) Dynamic Airspace ADS-X ADS-X NETWORK CENTRIC INFORMATION Airport ADS-X Ground-Based Users AOC, FBO, Business, Private, Etc. ADS-X Secured Access Responsive to Needs Air Traffic Management Facilities Airborne & Surface Based on original graphic courtesy of Crown Consulting, Inc

  14. Outline • Background • 2025 Concept for “Block-to-Block” Aircraft Operations • Private Sector Involvement / NGATS Institute • Schedule

  15. Public – Private Partnership National Strategic Outreach Working with Associations toIncrease Awareness Hear the voice of the customer Achieve participation of experts Federal Advisory Boards Ensure NGATS is Fully Vetted in Public Forums NGATS InstituteAchieve “Badgeless” Collaboration with Private Sector Experts

  16. Outline • Background • 2025 Concept for “Block-to-Block” Aircraft Operations • Private Sector Involvement / NGATS Institute • Schedule

  17. JPDO 3 Year Outlook FY06 FY07 FY05 Achieve a clear, consistent vision for NGATS and articulate all critical institutional, policy and technology issues Achieve a funded portfolio of aligned programs across agencies Achieve a clear, affordable roadmap to achieve NGATS Refine Architecture, Roadmapand Benefits Define the Required Portfolio to Implement the Roadmap Define Investment Options – Institutional, Policy and Technology Tradeoffs Complete Architecture,Roadmap, Benefits and Portfolio Complete Program Planningof Portfolio Elements Report on Performance Define Top-level Architecture, Roadmap and Benefits Assess Current Programs Derive Institutional / Policy / Technology Issues & Alternatives Transition from Planning to Implementation

  18. www.jpdo.aero

More Related