1 / 6

AB-ATB, Installation in LSS

AB-ATB, Installation in LSS. O. Aberle, L. Bruno, Y. Kadi, J. Lettry. DUMPS: TED : External dumps for the transfer lines (TI2, TI8 & IR7 for sector test) TBSE: Stoppers TDE : LHC beam dumps (point 6) TDI : Injection dumps (point 8 and 2) MASKS:

Download Presentation

AB-ATB, Installation in LSS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AB-ATB, Installation in LSS O. Aberle, L. Bruno, Y. Kadi, J. Lettry • DUMPS: • TED: External dumps for the transfer lines (TI2, TI8 & IR7 for sector test) • TBSE: Stoppers • TDE: LHC beam dumps (point 6) • TDI: Injection dumps (point 8 and 2) • MASKS: • TCDD: Injection protection masks (point 2) • TCDDM: Injection protection masks (point 8) • TCDIM: Transfer line masks (TI2 and TI8) • TCLIM: Masks in point 6, 2 and 8 • COLLIMATORS: (R.W. Assmann) • LHC (TCP, TCS, TCT, TCLA, TCLP, TCHS, TCLI …) • Transfer line (TCDI) O. Aberle, L. Bruno, Y. Kadi, J. Lettry

  2. TED O. Aberle, L. Bruno, Y. Kadi, J. Lettry

  3. TDEs O. Aberle, L. Bruno, Y. Kadi, J. Lettry

  4. TDIs O. Aberle, L. Bruno, Y. Kadi, J. Lettry

  5. TCDD, TCDDM O. Aberle, L. Bruno, Y. Kadi, J. Lettry

  6. Summary by LSS O. Aberle, L. Bruno, Y. Kadi, J. Lettry

More Related