SARMA SHREQ PROGRAM. Development for Safer Concrete Manufacturing & Delivery RPF MAY 2007. Presented by: Nico Pienaar Director – Sarma. Presented by: Nico Pienaar [Director - SARMA]. Background Domestic situation.
E N D
SARMA SHREQ PROGRAM Development for Safer Concrete Manufacturing & Delivery RPF MAY 2007 Presented by: Nico Pienaar Director – Sarma Presented by: Nico Pienaar [Director - SARMA]
Background Domesticsituation • Sarma members produce in the region of 75% of the total S A total Readymix market. • In 2006, Sarma audited approximately 170 plants for Health & Safety and Quality. • Fleet size of carrier units. • 2006 2007 2008 2009 2010 • 1583 1792 1954 2086 2281
Background Metric tons (Readymix)
Background • No of Transport Operators • (Sarma Members)
Background • Fleet composition is estimated as: • 90% = 6m3 trucks • 10% = 8m3 trucks • Ownership of readymix trucks range from: • Single truck operators • Fleet operators with excess of 20 trucks
Background • RMC logistics supply challenges, sensitivities and dependencies. • Access to raw materials – cement, fly ash and • slagment. • Lowering of industry quality, safety and • environmental standards by new entrants who • focus on quick returns. • Increased traffic congestion in urban markets.
SHREQ AUDIT • SHREQ: • Safety • Health • Road Transport • Environmental • Quality • Sarma had 2 audits: • SHE + Quality
SHREQ • Now all in one audit + Road Transport. • All Sarma member plants will be audited by an • independent auditor. In 2007 expecting to • audit 191 plants. • Results will be available on the Sarma website • as they are audited.
SHREQ • Policies that will be expected to be available in an organisation: • Recognition that SHREQ as an integral part of the business. • Recognition that SHREQ is a line management responsibility from • the top down. • Involvement and consultation with employees. • Provision of adequate training to meet competence levels. • Compliance with legal requirements and publishing of objectives. • Provisions of adequate resources. • Cost effective improvements in SHREQ performance. • Understanding and implementation at all levels. • Reviewing, auditing and maintenance of the system.
SHREQ Results and Evaluations: • This is not a competition. • Results will be in 3 levels:
THANKS FOR LISTENING! THOSE SLEEPING – THANKS FOR NOT SNORING!! SARMA CONTACT DETAILS : Telephone: (011) 498-7265 Telefax: (011) 498-7269 P O Box 61809 Marshalltown 2107 Web: http//www.sarma.co.za