1 / 15

SARMa Sustainable Aggregates Resource Management

SARMa Sustainable Aggregates Resource Management. Kick off meeting 15-17 June 2009 Bologna. WP3 Activities. 3.3: Recycling re-use of quarry and demolition wastes. NATIONAL ASSOCIATION PRODUCERS OF RECYCLED AGGREGATES Giorgio Bressi. POLITECNICO DI TORINO (sub-contractor)

Download Presentation

SARMa Sustainable Aggregates Resource Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna WP3 Activities 3.3: Recycling re-use of quarry and demolition wastes NATIONAL ASSOCIATION PRODUCERS OF RECYCLED AGGREGATES Giorgio Bressi POLITECNICO DI TORINO (sub-contractor) Gian Andrea Blengini, PhD. Elena Garbarino, PhD.

  2. SARMa Sustainable Aggregates Resource Management Recycling Kick off meeting 15-17 June 2009 Bologna WP3 Reuse 3.3 Recycling Action 3.3.a: (ANPAR, IGME, IGR, GeoZS, METE) Preparation of life cycle analyses of primary & secondary aggregates LCA identifies and quantifiesenergy and materials used, as well as releases to the environment and their potential impacts throughout the whole life cycle LCA (Life Cycle Assessment) ISO 14040 STANDARD “from-cradle-to-grave” • Raw Material Extraction • Processing • Production • Use and Maintenance • Disposal

  3. SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna WP3 3.3 Recycling …recycling can avoid landfill and partially displace environmental impacts of quarrying, but it is responsible of impacts related to re-processing and might increase transport-related impacts Subsystems in the life cycle of C&DW . “from-grave-to-cradle” AVOIDED LANDFILL RECYCLING COLLECTION DELIVERY of Recycled Aggregates (RA) AVOIDED PRODUCTION of Natural Aggregates (NA) (and Steel (RS))

  4. SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna WP3 3.3 Recycling ECOPROFILES OF NATURAL AGGREGATES (from-cradle-to-gate) BACKGROUND RESEARCH CERETTO QUARRY South of Torino, left side of Po river Production 500 000 t/a

  5. SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna WP3 3.3 Recycling ECOPROFILES OF RECYCLED AGGREGATES (from-gate-to-gate) BACKGROUND RESEARCH STATIONARY C&DW RECYCLING PLANT South of Torino Production 150000 t/a dry processing of mixed C&DW

  6. SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna WP3 3.3 Recycling EXPECTED RESULTS FROM THE LCA ANALYSIS OF THE RECYCLING CHAIN AVOIDED IMPACTS INDUCED IMPACTS AVOIDED IMPACTS NA DELIVERY AVOIDED LANDFILL NAT. AGGREG. COLLECTION RECYCLING RA DELIV. STEEL

  7. BACKGROUND CASE STUDY: LCA OF C&D WASTE MANAGEMENT IN TURIN (ITALY) SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna WP3 3.3 Recycling Around 90 plants considered . • Recycled aggregates • Type A: high quality RA for concrete and road construction (high Q) • Type B: medium quality RA for road and harbour construction • Type C: low quality RA for environmental filling and site rehabilitation A + B + C B + C C Stationary plants Semi-mobile plants Mobile plants

  8. SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna WP3 3.3 Recycling BACKGROUND CASE STUDY: LCA OF C&D WASTE MANAGEMENT IN TURIN (ITALY) LCA-GIS MODEL • TERRITORY COVERAGE OF MARKET DEMAND • ESTIMATION OF TRANSPORTATION DISTANCES (IMPORTANT CONTRIBUTION TO THE IMPACTS) •  TRANSPORTATION NETWORK NEEDS OPTIMISATION

  9. SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna WP3 3.3 Recycling BACKGROUND CASE STUDY: LCA OF C&D WASTE MANAGEMENT IN TURIN (ITALY) EXAMPLE OF DATA NEEDED FOR THE FUTURE LCA MODELS IN SARMa Inventory data for C&DW landfill (data per 1 t)

  10. SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna WP3 3.3 Recycling BACKGROUND CASE STUDY: LCA OF C&D WASTE MANAGEMENT IN TURIN (ITALY) EXAMPLE OF DATA NEEDED FOR THE FUTURE LCA MODELS IN SARMa Inventory of Collection of C&DW

  11. SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna WP3 3.3 Recycling BACKGROUND CASE STUDY: LCA OF C&D WASTE MANAGEMENT IN TURIN (ITALY) EXAMPLE OF DATA NEEDED FOR THE FUTURE LCA MODELS IN SARMa Inventory data for C&DW recycling (data per 1 t)

  12. SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna WP3 3.3 Recycling BACKGROUND CASE STUDY: LCA OF C&D WASTE MANAGEMENT IN TURIN (ITALY) EXAMPLE OF DATA NEEDED FOR THE FUTURE LCA MODELS IN SARMa Inventory data for Natural aggregate quarrying (data per 1 t)

  13. SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna WP3 3.3 Recycling LCA MODELS – CASE STUDIES FOR SARMa • AL: Fushe Kruje, • GR: Vermio, Vavdos/Gerakini, Laka, Mandalos, Araxos, • IT: Nerviano, Legnano • RO: Moldova Noua, Deva • SI: V. Pirešica, Sežana, Hotavlje, Dogoše, Novo mesto, Stahovica . NERVIANO

  14. SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna WP3 3.3 Recycling • WORKPLAN • Participants will be given a list of information and data that are needed to conduct Life Cycle Analysis • Tables to be filled in with request of site specific data will be sent to the participants • Instructions and support will be provided by ANPAR-POLITO . Expected results and deliverables: Anpar will provide manual on conduct of life cycle analyses including a number of case studies

  15. SARMa Sustainable Aggregates Resource Management Kick off meeting 15-17 June 2009 Bologna Thank you for your attention g.bressi@anpar.org POLITECNICO DI TORINO (sub-contractor) blengini@polito.it elena.garbarino@polito.it

More Related