An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair

  2. Introduction • Our Focus: • Prototype both a quarterback and a receiver in order to complete an offensive passing play. • Today’s Discussion: • Prototype construction • Programming • Documentation

  3. Previous Week’s Action Items • Item 1: Complete Design Documentation • Complete and proofread each deliverable. • Upload to website. • Tie up loose ends on website.

  4. Previous Week’s Action Items

  5. Previous Week’s Action Items • Item 2: Integrate Program Components • Combined components into one main program for the quarterback robot. • Designed code structure for receiver main program

  6. Previous Week’s Action Items

  7. SHOWSTOPPERS!!! • Throwing Arm Motor Malfunction • New Motor is Ordered and has been Shipped • Program is adaptable • Positively, last week’s showstopper has been fixed

  8. Current Status of Concept • Status of the Design • Finalizing Prototype Construction • Testing Prototype Performance

  9. Current Graphic

  10. Next Week’s Action Items • Complete Finished Prototypes • Integrate master receiver program • Install finalized circuits in robot bodies • Replace Throwing arm motor • Final body construction • Switches, Interrupt • TESTING

  11. Conclusion • Important Points: • A lot to do, 6 days left • Demonstrate Prototypes Next Tuesday

  12. Questions? • Any questions?