10 likes | 171 Views
Oklahoma. Turnpike. Authority. Proposal No. _____. Contract No. CKT-1345B. BROKEN ARROW SOUTH LOOP BRIDGES.
E N D
Oklahoma Turnpike Authority Proposal No. _____ Contract No. CKT-1345B BROKEN ARROW SOUTH LOOPBRIDGES • The work to be performed under Contract Number CKT-1345B consists of constructing Section 5 bridges which are predominantly dual three span structures. These bridges carry vehicular traffic over major and secondary roads, and a Union Pacific Railroad. The bridges utilize concrete deck on prestressed concrete beams consisting of AASHTO Type II (2309 LF), III (2677 LF), IV (1136 LF) and BT-72 (3,650 LF). The bridge substructures utlize integral and stub abutments founded on steel H-piles along with concrete bent frame piers founded on drilled shafts and spread footings. The horizontal and vertical alignment of bridges consist of both tangents and curves. CONSULTING ENGINEERS The Benham Group, Inc. 9400 North Broadway Oklahoma City, OK 73114 PREPARED BY HNTB Corporation 4608 South Garnett Road Tulsa, OK 74146 May, 1999