1 / 30

QESTRAIN –project

QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services. 1st Internal Report Lohja Hospital Area and Lohja Health Centre Sykli Environmental School of Finland.

cosmo
Download Presentation

QESTRAIN –project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal Report Lohja Hospital Area and Lohja Health Centre Sykli Environmental School of Finland

  2. QESTRAIN -project The main targets of Lohja Health Centre Basis: • Holistic approach (quality-safety-environment) • Practical tools • Work towards learning organization Main targets : • Commitment of management • Holistic view of quality • International and local cooperation

  3. The main targets of Lohja Health Centre… • Management commitment: • Economy, process, staff & client perspective • Strategies of the Health Centre and the Hospital Area • Practical working instruments • Management education • Holistic view of quality • Safety, quality, environment = Quality Policy • Unite existing quality projects: common procedures, common target and criteria • Continued quality control • Practical quality methods • International & local cooperation • Sharing & making use of knowledge • Examples • Safety plan “How to encounter an aggressive client / patient” • Long term patients excretion function • Implementation of guidelines for treatment / caring • Common work, common world

  4. QESTRAIN -project The main targets of Lohja Hospital Area • To have a good continuation to the successfully started quality work to continue with quality • To combine quality, environmental and safety activities (QES) together (= holistic approach) by having QUALITY of operations as the viewpoint • To highlight the quality view in the managemetn of operations • The continuous development and training of QES • Cooperation with Lohja Health Centre with the QES issues and activities

  5. Task 1.1 – Evaluationof needs and existing problems Objective: to identify the areas as related to the development of quality-environmental-safety issues at Lohja Hospital Area and Lohja Health Centre for the basis of the development of the training model • strenghts, best practices • develomental areas and issues • problematic areas and issues

  6. Task 1.1 - Evaluation02 – 05 / 2003 • Survey of work done and existing material 02 –05 / 2003 • including interviews and discussions • Management review & meeting 27.03. 2003 / 03.04.2003 • project info, basic concepts and managements views • Personnel informations 4.4.2003 / 06.05.2003 • project info & basic concepts • Questionnaires 23.04. – 09.05.2003 • specified personnel groups, working groups and departments • Work shops (2 – 3 hours) spring and autumn 2003 • specified personnel groups, working groups and departments • Management system audit at Health Centre • physiotheraphy and clinical laboratory, 13. & 14.05.2003 resp.

  7. Survey of work done and existing material02 – 05 / 2003 • Organization and operational surroundings • Environmental review and programme • Quality work • EQFM approach /hospital area • ITE –method / health centre • Occupational safety and security • Including interviews and discussions with key persons •  reports 06/2003

  8. Management review and meeting • general information of the project • the objectives of the project • the objectives and targets of pilot organizations • schedule and resources • review of total quality (QES) and management systems & processes • management interview • managements view of the most important areas

  9. Personnel information • general information of the project • the objectives of the project • the objectives and targets of pilot organizations • personnel´s role, schedule and resources • review of total quality (QES) and management systems & processes • managements view of the most important areas

  10. Questionnaire23.04. – 09.05.2003 • Target groups at the hospital area: • multiprofessional quality group • nursing quality group • environmental group and ”agents” of the departments • occupational health and safety organization • security group • management group • Target groups at the health centre: • Health & family counselling / as group answer • Hospital wards / in connection with the work shops, group answers • Technical service (partly) / in connection with the work shop • Doctors • Questionnaire possibly used in connection with the work shops at autumn? •  reports 06/2003

  11. Work shops • 2 – 3 hours per group • Facilitator (subcontractor) used • At health centre: • hospital wards – excretion function problem • 07.05. ja 20.05.2003 • continuation at autumn – process model • technical service (part) 22.05.2003 - questionnaire • dental care at autumn 2003 – process model • health and family counselling at autumn 2003 – process model • At hospital area: • Dates only agreed for autumn

  12. Management system audits • Based on standards ISO 9001, ISO 14001 and OHSAS 18001 • Lohja Health Centre • Physiotheraphy • Clinical laboratory • several years experience on ITE –method (based on main elements of ISO 9001) • one day audits

  13. Task 3 – Testing of the training model02 –08 / 2004 Objective: to test the personnel training models developed together for the implementation of quality – environmental – safety issues • On the basis of the needs of pilot organizations •  raportti 09 / 2004

  14. Task 1.1. – Results of the evaluation • Management reviews and meetings • Management´s objectives & key areas for the project and for the training • Linkage with other programmes and projects • Balanced Scorecard / both organizations • Human Resource Strategy / City of Lohja, Health Centre • Organizational groups / Lohja Hospital Area • EFQM Approach / Lohja Hospital Area • ITE –method / Lohja Health Centre, departments • Environmental Programme / both organizations • Security/safety programme / both organizations • Management´s commitment • Resources for the project • Training for the modelling and charting of processes!!

  15. Task 1.1. – Results of the evaluation… • Personnel information • One hour sessions for all personnel • Project leaflets • No discussion generated • Use of Intranet instead? • For smaller groups instead?

  16. Task 1.1. – Results of the evaluation… • Survey of the work done & existing material • Information for the review of the present state / 1st task for the development of integrated) managements system • Detailed information of the training needs, needs for improvement, good & best practices • Further discussion with the management vs management review + departments / groups  training needs categorized based on the importance of each item

  17. Task 1.1. – Results of the evaluation… • Questionnaire • Questions based on: • Management system elements / standards • Legal requirements / environmental, occupational safety, hazardous chemicals legislation • Tailored for both organizations • Specific programmes, plans, procedures, organizations / utilization of the results of the survey • Answers • Individually  use of statistics vs answering percentages/personnel groups • As groups by discussing  no possibility for the use of statistics BUT as a tool for discussion • Results / need for further information, training etc. • Further discussion with the management vs management review + departments / groups  training needs categorized based on the importance of each item

  18. Task 1.1. – Results of the evaluation… • Work shops: • 2 –3 hours per work shop • Facilitator & trainer as external agents • Delayed start, continued during autumn • Process approach! • Example: excretion function at Lohja Health Centre, hospital wards • Real, long term problem intertwining quality, environmental and safety aspects • Multiprofessional discussion needed  work shop participants from different personnel groups • Problem defining & problem solving • Process approach: patient´s day - as a concrete model • Continues on September  process model / chart

  19. Task 1.1. – Results of the evaluation… • Management system audits • As system audits difficult • At departmental level vs system elements • No top management commitment to system elements & procedures • As a tool for • training & discussion  ok • As a tool for further development  ok • Results clear nonconformancies to requirements • Audit as a tool e.g. for • Orientation programme for new employees

  20. Orientation material • The following material was used as orientation for total quality (QES), management systems and processes • at the management meetings • at personnel informations • Linkage with Balanced Scorecard • Linkage with EFQM

  21. DEMING CIRCLE AND CONTINUOUS IMPROVEMENT Plan Review of present state Goals Act New objectives Developmental issues Do Action programme Objectives and targets Activities Check Achievement of objectives Level of operations

  22. Resources • know how • technology • economy • cooperational tahot Task of pilot organization Customer needs Legislation Expectations of society and interest groups Needs of personnel • Results • customer feedback • financial result • outputs • personnel safisfaction • etc. Objectives Vision Strategy Goals OPERATIONS Core processes Support processes • Control • responsibilities, SOP´s, instructions, training • measures • conrol of onconformancies • development of processes Values of parent organization Assessment Development of operations

  23. PROCESS MODEL OF OPERATIONS Achievement of economical, quality, environmental and safety objectives SATISFACTION OF CUSTOMERS AND INTEREST GROUPS VISIO -> STRATEGIA -> OSAAMINEN -> RESURSSIT -> TIIMIT -> PROSESSIT -> SEURANTA -> KEHITTÄMINEN -> -> -> -> -> Nees of teams and personnel Economical, quality, environmental and safety objectives NEEDS OF CUSTOMERS AND INTEREST GROUPS Economical, quality, environmental and safety goals&objectives SUPPORT PROCESSES Financial Man´ HR Management IT Managment Interest group coop´n Housekeeping Communication CORE PROCESSES Services to the customers Satisfaction of teams and personnel Achievement of economica, quality, environmental and safety objectives management process core process support process

  24. Management System • Standards: • ISO 9001 (quality) • ISO 14001 (environment) • OHSAS 18001 (occupational health & safety) • Management and development of qualoity, environmental and safety issues: • - review of the present state • - identification & determination of important QES -aspects • - developmental objectives and activities • - responsibilities, procdures, instructions and control of operations • - training and communication • - assessment of operations, follow up and continuous improvement

  25. MODEL OF INTEGRATED MANAGEMENT SYSTEM QUALITY TOIMINTAYMPÄRISTÖ ENVIRONMENT SAFETY PRODUCTIVITY operations products processes • present state • remarkable environmental aspect • risk categories • important success factors continuous improvement Policy • Managed: • responsibilities • continuous follow up • nonconformancies • corrective & preventive actions • Improved: • goals & objectives • actions • responsibilities & resources • schedule • follow up instructons training communication • Follow up and development • internal audit • management review • suggestions for improvement

  26. BALANCED SCORECARD (BSC) (Tasapainotettu tuloskortti) • The implementation of strategy • Measurements of operations and results Critical success factors • customer view • economical view • personnel view • effectivity / process view • Objectives and measures for the different levels / units / processes of the organization

  27. BSC and Management Systems together • BSC and integrated Management System approaches can be applied simultaneously • Problems: double work • Different elements can be taken for specified purposes: • - setting up of goals and objectives & implementation of strategy -> BSC • - development and management of operations -> management system • - assessment and development -> BSC

  28. BASIC PROCESS MODEL Economical resources Personnel: knowledge, skills, attitudes Surroundings, machines, equipments, materials, etc Resources INPUTS OUTPUTS Instructions, responsibilities Control Control of nonconformancies, improvement of process Training measures, follow up

  29. Utilization of process descriptions in the planning of integrated management system (example) Inspection and diagnosis treatment activities patient taken in Follow up and assessment • Actions in different phases of the process • Critical factors (quality, environment, safety) • Flow of information between the different phases of the process • Issues to be documented • Records to be created

  30. WHAT IS NEEDED: • Identification of QES aspects and critical success factors together • Review of processes as a whole • Ideas and development • Agreements of common procedures and principles • Documentation of procedures and instructions • Communication and training • Assessment and follow up • Integration of QRS issues to the planning and management of other operations

More Related