1 / 9

ICFA Mini-Workshop on Start-to-End Simulations for X-Ray FELs

ICFA Mini-Workshop on Start-to-End Simulations for X-Ray FELs. DESY-Zeuthen. Power gain length. X-ray FELs will be the first multi-million accelerator projects with key performance depending exponentially on beam quality. New beam parameter regime & effects

coty
Download Presentation

ICFA Mini-Workshop on Start-to-End Simulations for X-Ray FELs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ICFA Mini-Workshopon Start-to-End Simulations for X-Ray FELs DESY-Zeuthen

  2. Power gain length • X-ray FELs will be the first multi-million accelerator projects • with key performance depending exponentially on beam quality. • New beam parameter regime & effects • Reliable understanding of beam dynamics of paramount importance

  3. Program is focussed on work done on benchmark-scenarios based on LCLS and TESLA XFEL design Thanks to program committee Jean-Paul Carneiro Paul Emma Torsten Limberg Heinz-Dieter Nuhn - and to participants! TTF2 FEL, the VUV FEL at the TESLA Test Facility will play a poineering role

  4. TTF2FEL Schedule: 2003 2004 2005 2006 2007 2008 Linac commissioning Injector installation Injector commissioning Complete vacuum installation Beam through undulator First Lasing @ 30 nm Saturation @30 nm First users @ 30 nm Tuning 30 – 120 nm Full beam current Installation of seeding and 3rd Harm. RF system 6 nm 1 GeV – 6 nm Norm. emittance: 2 mrad mm FWHM FEL pulse length: ca. 100 fs Peak current 2500 A Linac rep. rate 10 Hz Max. pulse rate 72 000

  5. Remarks on scientific program: • This is, by intention, a small workshop -- take your chance and be active ! • long lunch breaks for informal discussions and meetings • Meeting rooms available! • No printed proceedings, but material collected and posted on internet Visits planned: PITZ photoinjector test stand: Tuesday, 14:30h BESSY: Friday, 22. August, bus leaving DESY 15:30h

  6. Social events Wednesday, August 20th 14:00 Departure Bus Downtown 15:00 – 16:00 Visit „Schloss Charlottenburg“ 16:15 Ship starting from Charlottenburg along the Spree river 17:15 Stop at “Alte Börse” ; Visit of the “Friedrichswerdersche Kirche” 18:15 continuing cruise to Treptow 19:00 Restaurant Zenner (“Biergarten”); buffet covered by fee, drinks pay yourself 21:00 Bus leaving for DESY / Seehotel Thursday, August 21st 16:30 Excursion Berlin City 18:30 1 h time for private activities (Shopping). 19:30 DINNER at “Französischer Hof” (Gendarmenmarkt) 22:00 Bus leaving from Gendarmenmarkt for Zeuthen

  7. If you need any assistance, don‘t hesitate to contact workshop secretariat

  8. For participants staying at Seehotel: Shuttle service: In the morning: DESY shuttle bus leaves 8:10h from main entrance Taxi boat leaves 8:00 from the hotel pier EXCEPT for Thursday several private cars Any other time: Hotel shuttle can be called by phone e.g. to pick you up at S-Bahn station

More Related