20 likes | 155 Views
VAE 193 –Field PDI issues & Countermeasures. Drain pan not seated properly and fouling with chiller tray. Temp Action: Extra length wrapped with cable tie Perm. Action: Extra length has to be reduced. Bulb wire harness hanging.
E N D
VAE 193 –Field PDI issues & Countermeasures Drain pan not seated properly and fouling with chiller tray Temp Action: Extra length wrapped with cable tie Perm. Action: Extra length has to be reduced Bulb wire harness hanging Metal reinforcement plate will be used for proper fitment (same as 324 l) Arul RB Evap. Fitment loose