KYTC Bridge Preservation and Maintenance Program. David Steele, P.E. Branch Manager for Bridge Preservation. Bridge Inventory. 9,025 = Number of State Maintained Bridges 632 = Structurally Deficient (7%)
E N D
KYTC Bridge Preservation and Maintenance Program David Steele, P.E. Branch Manager for Bridge Preservation
BridgeInventory 9,025 = Number of State Maintained Bridges 632 = Structurally Deficient (7%) 4,709 = Number of Local Maintained Bridges
Central Office Staff • Branch Manager (P.E.) • Chief Bridge Inspector • Contract Section–Repairs (3 people) Paint (1 person) • Scour and Preventive Maintenance (1 P.E.) • Load Rating Engineers (2 P.E.’s) • Ohio and Big Sandy River Bridges Manager (1 P.E) • Inventory – Pontis System Administrators (2) • Snooper Manager • Administrative Specialist