Jeff Lerud , PE, CPM Senior Project Manager Nevada Department of Transportation. Discussion Points:. Design Bid Build vs. Design Build I80 Robb Drive to Vista Blvd. Project Major Elements Challenges/ Successes of Project Question/ Answer. BUT FIRST… Tell me about you Name
E N D
Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation
Discussion Points: • Design Bid Build vs. Design Build • I80 Robb Drive to Vista Blvd. Project • Major Elements • Challenges/ Successes of Project • Question/ Answer
BUT FIRST… Tell me about you Name Where you’re from NDOT or I80 Project experience
Design Bid Build vs. Design Build • Innovation • Builder input • Faster Delivery • Design/construction overlap • Risk Allocation • Shifting risk • Cost Certainty • Upfront
Design Bid Build vs. Design Build Design Bid Build Advantages Traditional delivery Facilitates bidder competition Department controls design Right-of-Way and Utilities managed during design
Design Bid Build vs. Design Build Design Bid Build Disadvantages Little risk transfer to contractor Contractor has no input during design phase Department responsible for design/constructability risks Minimal opportunity for innovation Public funding required upfront
Design Bid Build vs. Design Build Design Build Advantages One entity is responsible for delivery of entire project Risk is transferred from Department to DB team Construction may begin before final design DB participates in design phase
Design Bid Build vs. Design Build Design Build Disadvantages Department has less control over design Risk allocation Administrative costs greater Best value may not be lowest bid Public funding required upfront
Concept 1 Pavement Reconstruction: Keystone Ave. to 4th St. Keystone Ave. 4th St.
Concept 2 Concept 2: Intelligent Transportation System (ITS)
Intelligent Transportation System ITS Devices • Dynamic Message Signs (DMS) • Travel Time Signs (TTS) • Ramp Meters Benefits • Quicker Incident Response Times • Informing the Motorists of Accidents and Travel Times • TRIP RELIABILITY
Concept 4 and 5 Concept 4Restripe I-80 EB to I-580 SB on-ramp Concept 5Widen Virginia St. WB off-ramp to two lanes
Concept 8 Sparks Blvd: Loop Ramp; Triple Lefts
Concept 9 Auxiliary Lanes: E. McCarran Blvd to Vista Blvd.
Project Successes/ Challenges • Traffic Control • Construction Meters • Design Complete • Ahead of Schedule • Stakeholder Participation • Public Outreach • New Processes • Design Bid Build • Resources • 3 DB projects • Preferences • Risk Transfer • Subgrade
Questions? Thank you! Jeff Lerud, Project Manager 775-888-7589 jlerud@dot.state.nv.us