350 likes | 360 Views
Bathymetric Mapping Made Easy!. Required Steps. Preparations Data Collection Point Data Tin Data Raster Data Contour Map Statistic Calculations. Preparations. I will need to gather the following items. Depth Finders. Preparations. Data collection. Preparations.
E N D
Required Steps • Preparations • Data Collection • Point Data • Tin Data • Raster Data • Contour Map • Statistic Calculations
Preparations. I will need to gather the following items. Depth Finders
Preparations. Data collection
Preparations. For winter data collection.
Preparations. Analyizing
Statistic Calculations. 1.) Total Volume 2.) Convert necessary units 3.) Hypsographic Curve 4.) Turn Over Time
Final Statistics. • Acre Feet = 88.84 • Total Volume = 109,586.24m3 • Turn Over Time ~ 7 Days
Why make a map of the Fall Creek Pond? 1.) Learning. 2.) Curiosity. 3.) Later Projects.
Special Recognitions Mr. Paul Tweed – With everything from Project Ideas, Getting Comfortable with the Software, Data Collection, and Final Analysis. Mr. Peter Kofman – Anti-Procrastination Robot Mr. Will Jacobs – Data Collection Jordan Ball – Data Collection Garet Baader – Data Collection Jason Mikelson – Data Collection Jake Yule – Data Collection
Life Savers All ArcView and ArcGIS Programs – ArcMap, ArcScene, ArcPad, and ArcCatalog. Logger Pro 3.4.1 Trimble Quick Plan www.ConvertUnit.com