Routine Immunization Performance. December 2009 Feedback to States and Zone. Data as at 15 th January 2010 in National Database. Completeness of HF Reporting Dec 2009. % LGA Completeness of Reporting by State: Dec 2009. SUMMARY (1). Improving Access-1 .
E N D
Routine Immunization Performance December 2009 Feedback to States and Zone Data as at 15th January 2010 in National Database
SUMMARY (1) Improving Access-1. • 20 States had >=90% completeness of HF reporting in December while others did not meet the 90% target. • Kogi, Taraba Nassarawa, Zamfara and Oyo have below 70% HF completeness • While, Ogun, Gombe Yobe and Bayelsa have less than 40% of HF reporting in December 2009 • No data from any health facility in Ebonyi State. • HF completeness nationally is just 77.3% • Benue, Gombe, Taraba, Yobe, Nassarawa, Kogi, Niger, Kwara, Enugu, Ogun and Oyo States had less than 90% of their LGAs reporting in December 2009. • Reports for 695 out of 774 LGAs received for December 2009 Action point: All States with incomplete reports should follow up with relevant LGAs /HFs and provide updated reports for Jan –December 2009 by 15thof February 2010
Summary (2) Improving Access-2 Fixed Sessions: • 16/37 States have performance above 80% of planned fixed sessions • 10/37 States conducted less than 50% of planned sessions!!! • No reports from Kogi, Adamawa, Bauchi, AKS and Bayelsa States Outreach Sessions • 17 States have performance above 80% of planned outreach sessions. • 7 States conducted less than 50% of planned sessions!!! • No reports from Kogi, Adamawa, Bauchi, AKS, Rivers and Bayelsa States
Routine Immunization DPT3 Cumulative Coverage Dec 09 Nigeria
Routine Immunization Performance Cumulative Dec 09 Nigeria DPT3= 70% OPV3=62% < 50 % 50 -79.99% 80 - 100% Above 100 % HBV3=70%
Routine Immunization Performance Cumulative Dec 09 Nigeria BCG= 73% YF=61% < 50 % 50 -79.99% 80 - 100% Above 100 % MV=79%
Proportion of LGAs with DPT3 >=80% Dec 2009 <25% of LGAs 25-50% of LGAs 50-79.9% of LGAs >=80% of LGAs
SUMMARY (3) DPT3 Coverage. • December compared to November • In NCZ; FCT and Plateau States had improved performance in others declined especially Nassarawa State. • In NEZ improvement occurred in Bauchi and Borno while others declined especially Yobe • In NWZ, Jigawa, Kebbi and Sokoto had improvement, all others declined. • In SEZ only Ebonyi declined with others improving and Abia with no change • In SSZ, CRS and Rivers made some improvement with others declining. • In SWZ Ekiti, all States declined especially Ogun and Oyo States. • 10 States have reached the Target of 80% DPT3 coverage for the year 2009. • Zamfara and Yobe are the only States with DPT3 <50% • Only Akwa-Ibom State have at least 80% of their LGAs with cumulative DPT3 of 80% for 2009 • Many key states especially in the northwest have more than 50% of their LGAs with DPT3 < 50%, particularly states like Zamfara with 70% of their LGAs and Kano and Yobe with 60% of LGAs having DPT3 less than 50%
Un-Immunized Children as at December 2009 Kano with over 120,000 unimmunized is surrounded by states with over 60,000 un-immunized children as at December 2009
SUMMARY (4) • Un-Immunized Children • Bauchi, Jigawa, Kaduna, Kano, Katsina, Zamfara, Ogun, Oyo and Lagos States continues to have high numbers of Un-immunized Children of well over 60,000 un-immunized Children in each State as at December 2009 • However,Kano Statehas significantly High number of Un-immunized Children of over 200,000 as at December 09!!!.
SUMMARY (5) DPT1/3 Drop out Rates. • Benue, Kogi, FCT, Kwara, Kebbi, Abia, Enugu, Imo, Ekiti, Lagos, Ondo and Osun States have drop out rates within acceptable limits. • All other states have drop out rates above 10% with States like Yobe and Zamfara having DPT1-3 drop out rates of over 25%
Vaccine Wastage Rates Profile by Dec 09 Std WR for DPT Std WR for MV
SUMMARY (6) • Vaccine Wastage Rates. • Wastage rates for DPT has remain generally satisfactory in December except Kano • Most States had for measles vaccine wastage rates within acceptable limits. • Plateau Bauchi, Zamfara, Bayelsa, Cross River and Kano with MV wastage rates close to 50%.
No of Health Facilities and frequency of Planned Community Link Activities August 2009 Review
Community Link Activities Review • Most States do not have plans for Community Link activities • Out of the 22,876 HFs conducting RI in the country only 5,590 (25%) have plans for Community link meetings • 38% (8,815) HF have plans to conduct HE sessions. • Only 14 States had a report for community Link between August 2009 • Community Link committee Meetings • Out of the 14 States with reports • 8 states were more than 80% of meetings planned meetings conducted. • less than 50% of planned meetings were conducted in 4 States • Health Education Sessions • Similarly for Health Education Sessions • 6 states had more than 80% of HE session conducted • Less than 50% of planned HE sessions were conducted in 3 States