Work Zone Safety CE 486 Spring 2004 DISCLAIMER: This document is provided as part of the requirements of a civil engineering course at Iowa State University and does not constitute a professional engineering design or a professional land surveying document. Although the information is intended to be accurate, students, instructors, and Iowa State University make no claims, promises, or guarantees about the accuracy, completeness, or adequacy of the information. The user of this document shall ensure that such use does not violate Iowa law with regard to professional licensing and certification requirements, including any work resulting from this student-prepared document required to be under the responsible charge of a licensed engineer or surveyor. RoadSafety@iastate.edu
Acknowledgements • Client Mark Bortle, Safety Engineer (IDOT) • Advisors Dr. John Lamont (ECpE) Prof. Ralph Patterson III (ECpE) AAP Duane Smith P.E. (CCEE) Prof. Veronica Dark (Psych)
Road Construction Safety TeamSD-May04-01Outline • Defining the RS-4 Work Zone Matthew Baker: EE • Analyzing Crash Data Nancy Suby-Bohn: CE
Outline“Grabbing driver’s cognitive reasoning” • Distracted or “Zoned Out” Josh Keith: CE • Classical Conditioning Angel Anderson: CprE • Instrumental Conditioning Abdul Nuhu: EE
Outline • Real-time Information Clinton Dawson: CprE • Education the Public Amit Agarwal: CprE
http://seniord.ee.iastate.edu/may0401/ Photo courtesy IDOT
Photo courtesy of Work Zone Safety for Iowa DOT Construction Projects
Work Zone • day or night • scheduled daily work Picture courtesy of MUTCD 2000
Flagger Flagger Combined with a pilot car Picture courtesy of MUTCD 2000
Flagger Flagger Combined with a pilot car • Lane Closure • usually stretches between 2 and 2 ½ miles Picture courtesy of MUTCD 2000
1 - Lane closure 2 - Lane shift/crossover (head-to-head traffic) ** 3 - Work on Shoulder or median 4 - Intermittent or Moving work ** 8 - Other type of work zone (explained in narrative) 9 - Unknown
Temporary Rumble Strips • Placement- Advance Warning Area • Tactile and auditory stimulus to focus driver’s attention on impending construction • ¼” Thickness combined with road construction orange • Currently determining ideal placement pattern and ADT guidelines • Research from MwSWZDI and Texas Transportation Institute
Distractions • Cell Phones • Road Hypnosis • Passengers • Daily pattern/rut
Possible Reasons Getting one’s attention is not the same as getting to one’s decision process. • Classical Conditioning – Stop Sign • Instrumental Conditioning – reaction to a police car • Learned Irrelevance – lack of need to respond • Conscious Choice – realizing a need to respond Veronica Dark, Assoc Professor, Department of Psychology, ISU
Signs www.addcoinc.com/t_smart.htm and pennsylvania IDOT
Variable Message Fine Display Sign • Radar + Variable Message Board + Fine • Easily Programmable • Data Collection Options
The Current Problem Photo courtesy of Work Zone Safety for Iowa DOT Construction Projects
Work Zone Exit/Entrance • Goal: Design all encompassing system • Configure light timing mechanisms • Determine most effective light configuration • Modify traffic lights to needed specifications • Two approaches considered • Portable traffic light • 3 mode portable traffic light w/gate
Work Zone Exit/Entrance cont… • Portable traffic light • Seven day battery life before charge with optional solar power unit. • A cell-phone based status monitor informs workers of malfunctions • Vehicle presence sensor mode • Ability to operate continuously for 365 days a year
Work Zone Exit/Entrance cont… • 3 mode portable traffic light w/gate • Seven day battery life before charge with optional solar power unit. • Removable break away gate • Automatic mode, Manual mode, and • Wired remote mode.
511 Phone/Website • Suggestions to improve or change current 511 website • Make changes to the 511 automated phone-system • Add features • Spread awareness among public to increase use • Raise user friendliness of the system
Current Methods • Research methods used currently • Whom do they target? • Do they fulfill the requirement of the project? • Adaptable? • Cost Effectiveness • Different campaigns underway nationally • Study the campaigns in Iowa and other states • Analyze their effectiveness • Whether they are realizable in Iowa
Educational component • Multiple Objectives: • Educate the public (drivers, future drivers) • Different types of drivers (SUVs, cars, trucks, etc..) • Different approaches for each category • Educate the construction workers • Using the new setup • Basic safety guidelines to follow
Conclusion • Different components being designed for greater effectiveness • All the components might not be implemented immediately or together • Components are aimed for maximum cognitive stimulation • Components meet design plan submitted to the client
Any Questions? Photo courtesy of Work Zone Safety for Iowa DOT Construction Projects