SHORT TERM OPEN ACCESS CASE STUDIES. STOA OF KSEB(KYCPP) - TNEB 0000 HRS – 2400 HRS 150MW AT KYCPP EXBUS POINT for 39 days. CUSTOMER: TNEB. TRADER: NVVNL. INJECTING UTILITY KYCPP, KSEB. DRAWEE UTILITY TNEB. KERALA. CAPACITY APPROVED 150 MW.
E N D
STOA OF KSEB(KYCPP) - TNEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 39 days CUSTOMER: TNEB TRADER: NVVNL INJECTING UTILITY KYCPP,KSEB DRAWEE UTILITY TNEB KERALA CAPACITY APPROVED 150 MW DAILY PERIOD 0000-2400 HRS TAMILNADU DATE OF COMMENCEMENT 21-01-05 DATE OF EXPIRY 28-02-05 KAYAMKULAM CCGT(NTPC)
STOA OF KSEB(KYCPP) - TNEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 39 daysFROM 21-01-05 TO 28-02-05, THROUGHOUT THE DAY EXPORT AT KYCPP BUS 150 MW LOSSES IN KERALA 0.75% AT KERALA PERIPHERY 148.9 MW KERALA TAMILNADU LOSSES IN SR 3.12% TN RECIEVES 144.3 MW TOTAL LOSSES FOR TRANSACTION 5.7 MW KAYAMKULAM CCGT(NTPC)
MORE DETAILS NEW STOA OF KSEB(KYCPP) - TNEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 39 daysFROM 21-01-05 TO 28-02-05, THROUGHOUT THE DAY APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION • SCHEDULING CHARGES PER DAY • Rs 3000 FOR SRLDC • Rs 3000 FOR KSEB KERALA TAMILNADU • TRANSMISSION CHARGES PER MW PER DAY • Rs 700.91 FOR CTU-SR • Rs 672.07 FOR KERALA TOTAL TRANSMISSION CHARGE PER UNIT 6/. Ps KAYAMKULAM CCGT(NTPC)
MP WR GRID HVDC BACK TO BACK AT BHADRWATHI IN WR AP APTRANSCO - MPSEB THROUGH NVVNL (0000 HRS – 0500 HRS and 2300 HRS – 2400 HRS ) 200 MW AT INJECTION POINT for 24 days i.e 08.01.05 to 31.01.05 CUSTOMER: NVVNL TRADER: NVVNL INJECTING UTILITY APTRANSCO DRAWEE UTILITY MPSEB • INTERVENING REGIONAL LINK • SR-WR CAPACITY APPROVED 200 MW DAILY PERIOD 0000-0500& 2300-2400 HRS DATE OF COMMENCEMENT 08-01-05 DATE OF EXPIRY 31-01-05
MP WR GRID HVDC BACK TO BACK AT BHADRWATHI IN WR AP APTRANSCO - MPSEB THROUGH NVVNL (0000 HRS – 0500 HRS and 2300 HRS – 2400 HRS ) 200 MW AT INJECTION POINT for 24 days i.e 08.01.05 to 31.01.05 EXPORT AT AP 200 MW LOSSES IN SR 3.12% AT SR PERIPHERY 193.8 MW CTU LOSSES IN WR 4% MP RECIEVES 186.1 MW TOTAL LOSSES FOR TRANSACTION 13.9 MW
MP WR GRID HVDC BACK TO BACK AT BHADRWATHI IN WR AP MORE DETAILS NEW APTRANSCO - MPSEB THROUGH NVVNL (0000 HRS – 0500 HRS and 2300 HRS – 2400 HRS ) 200 MW AT INJECTION POINT for 24 days i.e 08.01.05 to 31.01.05 APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION • SCHEDULING CHARGES PER DAY • Rs 3000 FOR SRLDC • Rs 3000 FOR WRLDC • TRANSMISSION CHARGES PER MW PER DAY • Rs 700.91 FOR CTU-SR • Rs 881.49 FOR SR-WR LINK • Rs 339.98 FOR CTU-WR TOTAL TRANSMISSION CHARGE PER UNIT 33Ps/.
SR WBSEB - AJMER WHEEL THROUGH SR (0000 HRS – 1700 HRS AND 2300-2400 HRS) 20 MWFROM 05.01.05 to 31.01.05 HVDC BACK TO BACK AT VINDHYACHAL IN WR CUSTOMER: NVVNL TRADER: NVVNL RAJASTHAN WB INJECTING UTILITY WBSEB AJMER NR DRAWEE UTILITY AJMER (DISCOM) INTERVENING REGION SR & WR ER • INTERVENING REGIONAL LINK • ER-SR • SR-WR • WR-NR WR HVDC BACK TO BACK AT BHADRWATHI IN WR INTERVENING STATE TRANSMISSION UTILITY RRVPN CAPACITY APPROVED 20 MW DAILY PERIOD 0000-1700 & 2300-2400 hrs HVDC BACK TO BACK AT GAZUWAKA IN SR DATE OF COMMENCEMENT 05-01-05 DATE OF EXPIRY 31-01-05
SR WBSEB - AJMER WHEEL THROUGH SR (0000 HRS – 1700 HRS AND 2300-2400 HRS) 20 MW FROM 05.01.05 to 31.01.05 HVDC BACK TO BACK AT VINDHYACHAL IN WR EXPORT AT WB 20 MW LOSSES IN ER 3% NR AT ER-SR PERIPHERY 19.4 MW RAJASTHAN WB LOSSES IN SR 3.12% AJMER AT SR-WR PERIPHERY 18.8 MW ER LOSSES IN WR 4% WR AT WR-NR PERIPHERY 18.1 MW LOSSES IN NR 3% HVDC BACK TO BACK AT BHADRWATHI IN WR AT NR-RAJ.PERIPHERY 17.6 MW LOSSES IN RAJASTHAN 3% AJMER RECIEVES 17.1 MW HVDC BACK TO BACK AT GAZUWAKA IN SR TOTAL LOSSES FOR TRANSACTION 2.9 MW
SR MORE DETAILS NEW WBSEB - AJMER WHEEL THROUGH SR (0000 HRS – 1700 HRS AND 2300-2400 HRS) 20 MW AT INJECTION POINT FROM 05.01.05 to 31.01.05 HVDC BACK TO BACK AT VINDHYACHAL IN WR APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION RAJASTHAN NR WB • SCHEDULING CHARGES PER DAY • Rs 3000 FOR ERLDC • Rs 3000 FOR SRLDC • Rs 3000 FOR WRLDC • Rs 3000 FOR NRLDC • Rs 3000 FOR RAJASTHAN AJMER ER WR • TRANSMISSION CHARGES PER MW PER DAY • Rs 313.93 FOR CTU-ER • Rs 1462.44 FOR ER-SR LINK • Rs 700.91 FOR CTU-SR • Rs 881.49 FOR SR-WR LINK • Rs 339.98 FOR CTU-WR • Rs 233.92 FOR WR-NR LINK • Rs 649.86 FOR CTU-NR • Rs 686.3 FOR RAJASTHAN HVDC BACK TO BACK AT BHADRWATHI IN WR HVDC BACK TO BACK AT GAZUWAKA IN SR TOTAL TRANSMISSION CHARGE PER UNIT 78Ps/.
STOA OF APTRANSCO-KPTCL, 100 MW FROM 0000 HRS – 0400 & 2200-2400 HRS KAR AP CUSTOMER: PTC TRADER: PTC INJECTING UTILITY APTRANSCO DRAWEE UTILITY KPTCL INTERVENING REGION SR CAPACITY APPROVED 100 MW DAILY PERIOD 0000 HRS – 0400 & 2200-2400 HRS DATE OF COMMENCEMENT 20-02-05 DATE OF EXPIRY 28-02-05
KAR AP STOA OF APTRANSCO-KPTCL, 100 MW FROM 0000 HRS – 0400 & 2200-2400 HRS EXPORT AT APTRANSCO 100 MW LOSSES IN SR 3.04% AT KPTCL PERIPHERY 96.96 MW TOTAL LOSSES FOR TRANSACTION 3.04 MW
KAR AP MORE DETAILS NEW STOA OF APTRANSCO-KPTCL, 100 MW FROM 0000 HRS – 0400 & 2200-2400 HRS APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION • SCHEDULING CHARGES PER DAY • Rs 3000 FOR SRLDC • TRANSMISSION CHARGES PER MW PER DAY • Rs 700.91 FOR CTU-SR TOTAL TRANSMISSION CHARGE PER UNIT 12.5/. Ps
WB ER HVDC BACK TO BACK AT GAZUWAKA IN SR KAR SR CTU STOA OF WBSEB - KPTCL (0000 – 1700 & 2300 – 2400 HRS) 46 MW AT INJECTION POINT FROM 22.02.05 to 28.02.05 CUSTOMER: PTC TRADER: PTC INJECTING UTILITY WBSEB DRAWEE UTILITY KPTCL INTERVENING REGIONAL LINK ER-SR CAPACITY APPROVED 46 MW DAILY PERIOD 0000-1700 & 2300-2400 HRS DATE OF COMMENCEMENT 22-02-05 DATE OF EXPIRY 28-02-05
KAR SR CTU STOA OF WBSEB - KPTCL (0000 – 1700 & 2300 – 2400 HRS) 46 MW AT INJECTION POINT FROM 22.02.05 to 28.02.05 EXPORT AT WB 46 MW LOSSES IN ER 3% WB AT ER-SR PERIPHERY 44.62 MW ER LOSSES IN SR 3.12% HVDC BACK TO BACK AT GAZUWAKA IN SR KPTCL RECEIVES 43.23 MW TOTAL LOSSES FOR TRANSACTION 2.77 MW
KAR SR CTU MORE DETAILS NEW STOA OF WBSEB - KPTCL (0000 – 1700 & 2300 – 2400 HRS) 46 MW AT INJECTION POINT FROM 22.02.05 to 28.02.05 APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION WB • SCHEDULING CHARGES PER DAY • Rs 3000 FOR ERLDC • Rs 3000 FOR SRLDC ER HVDC BACK TO BACK AT GAZUWAKA IN SR • TRANSMISSION CHARGES PER MW PER DAY • Rs 313.93 FOR CTU-ER • Rs 1462.44 FOR ER-SR LINK • Rs 700.91 FOR CTU-SR TOTAL TRANSMISSION CHARGE PER UNIT 14.8/. Ps
BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF APTRANSCO – MPSEB OF NVVNL (200 MW)
BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF KYCPP – TNEB OF NVVNL (150 MW)
BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF WBSEB – AJMER(RAJASTHAN) (20 MW)
BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF KYCPP – TNEB OF NVVNL (150 MW)
BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF APTRANSCO – MPSEB OF NVVNL (200 MW)
BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF WBSEB – AJMER(RAJASTHAN) (20 MW)
BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF WBSEB - KPTCL (0000 – 1700 & 2300 – 2400 HRS) 46 MW
BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF WBSEB - KPTCL (0000 – 1700 & 2300 – 2400 HRS) 46 MW
BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OFAPTRANSCO-KPTCL, 100 MW FROM 0000 HRS – 0400 & 2200-2400 HRS
BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OFAPTRANSCO-KPTCL, 100 MW FROM 0000 HRS – 0400 & 2200-2400 HRS