SHORT TERM OPEN ACCESS CASE STUDIES

SHORT TERM OPEN ACCESS CASE STUDIES. STOA CASE - 1. WBSEB to AJMER (Rajasthan) 20 MW for 27 days from 0000 to 1700 hrs. and 2300 to 2400 hrs. SR. WBSEB - AJMER WHEEL THROUGH SR (0000 HRS – 1700 HRS AND 2300-2400 HRS ) 20 MW FROM 05.01.05 to 31.01.05.

zeke
Download Presentation

SHORT TERM OPEN ACCESS CASE STUDIES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SHORT TERM OPEN ACCESS CASE STUDIES

  2. STOA CASE - 1 WBSEB to AJMER (Rajasthan) 20 MW for 27 days from 0000 to 1700 hrs. and 2300 to 2400 hrs.

  3. SR WBSEB - AJMER WHEEL THROUGH SR (0000 HRS – 1700 HRS AND 2300-2400 HRS) 20 MWFROM 05.01.05 to 31.01.05 HVDC BACK TO BACK AT VINDHYACHAL IN WR CUSTOMER: NVVNL TRADER: NVVNL RAJASTHAN WB INJECTING UTILITY WBSEB AJMER NR DRAWEE UTILITY AJMER (DISCOM) INTERVENING REGION SR & WR ER • INTERVENING REGIONAL LINK • ER-SR • SR-WR • WR-NR WR HVDC BACK TO BACK AT BHADRWATHI IN WR INTERVENING STATE TRANSMISSION UTILITY RRVPN CAPACITY APPROVED 20 MW DAILY PERIOD 0000-1700 & 2300-2400 hrs HVDC BACK TO BACK AT GAZUWAKA IN SR DATE OF COMMENCEMENT 05-01-05 DATE OF EXPIRY 31-01-05…

  4. SR WBSEB - AJMER WHEEL THROUGH SR (0000 HRS – 1700 HRS AND 2300-2400 HRS) 20 MW FROM 05.01.05 to 31.01.05 HVDC BACK TO BACK AT VINDHYACHAL IN WR EXPORT AT WB 20 MW LOSSES IN ER 3% NR AT ER-SR PERIPHERY 19.4 MW RAJASTHAN WB LOSSES IN SR 3.12% AJMER AT SR-WR PERIPHERY 18.8 MW ER LOSSES IN WR 4% WR AT WR-NR PERIPHERY 18.1 MW LOSSES IN NR 3% HVDC BACK TO BACK AT BHADRWATHI IN WR AT NR-RAJ.PERIPHERY 17.6 MW LOSSES IN RAJASTHAN 3% AJMER RECIEVES 17.1 MW HVDC BACK TO BACK AT GAZUWAKA IN SR TOTAL LOSSES FOR TRANSACTION 2.9 MW…

  5. SR MORE DETAILS NEW WBSEB - AJMER WHEEL THROUGH SR (0000 HRS – 1700 HRS AND 2300-2400 HRS) 20 MW AT INJECTION POINT FROM 05.01.05 to 31.01.05 HVDC BACK TO BACK AT VINDHYACHAL IN WR APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION RAJASTHAN NR WB • SCHEDULING CHARGES PER DAY • Rs 3000 FOR ERLDC • Rs 3000 FOR SRLDC • Rs 3000 FOR WRLDC • Rs 3000 FOR NRLDC • Rs 3000 FOR RAJASTHAN AJMER ER WR • TRANSMISSION CHARGES PER MW PER DAY • Rs 313.93 FOR CTU-ER • Rs 1462.44 FOR ER-SR LINK • Rs 700.91 FOR CTU-SR • Rs 881.49 FOR SR-WR LINK • Rs 339.98 FOR CTU-WR • Rs 233.92 FOR WR-NR LINK • Rs 649.86 FOR CTU-NR • Rs 686.3 FOR RAJASTHAN HVDC BACK TO BACK AT BHADRWATHI IN WR HVDC BACK TO BACK AT GAZUWAKA IN SR TOTAL TRANSMISSION CHARGE PER UNIT 34.15Ps/….

  6. STOA CASE - 2 APTRANSCO to MPSEB 200 MW for 24 days from 0000 to 0500 hrs. and 2300 to 2400 hrs.

  7. MP WR GRID HVDC BACK TO BACK AT BHADRWATHI IN WR AP APTRANSCO - MPSEB THROUGH NVVNL (0000 HRS – 0500 HRS and 2300 HRS – 2400 HRS ) 200 MW AT INJECTION POINT for 24 days i.e 08.01.05 to 31.01.05 CUSTOMER: NVVNL TRADER: NVVNL INJECTING UTILITY APTRANSCO DRAWEE UTILITY MPSEB • INTERVENING REGIONAL LINK • SR-WR CAPACITY APPROVED 200 MW DAILY PERIOD 0000-0500& 2300-2400 HRS DATE OF COMMENCEMENT 08-01-05 DATE OF EXPIRY 31-01-05…

  8. MP WR GRID HVDC BACK TO BACK AT BHADRWATHI IN WR AP APTRANSCO - MPSEB THROUGH NVVNL (0000 HRS – 0500 HRS and 2300 HRS – 2400 HRS ) 200 MW AT INJECTION POINT for 24 days i.e 08.01.05 to 31.01.05 EXPORT AT AP 200 MW LOSSES IN SR 3.12% AT SR PERIPHERY 193.8 MW CTU LOSSES IN WR 4% MP RECIEVES 186.1 MW TOTAL LOSSES FOR TRANSACTION 13.9 MW…

  9. MP WR GRID HVDC BACK TO BACK AT BHADRWATHI IN WR AP MORE DETAILS NEW APTRANSCO - MPSEB THROUGH NVVNL (0000 HRS – 0500 HRS and 2300 HRS – 2400 HRS ) 200 MW AT INJECTION POINT for 24 days i.e 08.01.05 to 31.01.05 APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION • SCHEDULING CHARGES PER DAY • Rs 3000 FOR SRLDC • Rs 3000 FOR WRLDC • TRANSMISSION CHARGES PER MW PER DAY • Rs 700.91 FOR CTU-SR • Rs 881.49 FOR SR-WR LINK • Rs 339.98 FOR CTU-WR TOTAL TRANSMISSION CHARGE PER UNIT 33Ps/.

  10. STOA CASE - 3 KAYAMKULAM CCGP, NTPC to TNEB 150 MW for 39 days on Round the Clock basis

  11. STOA OF KSEB(KYCPP) - TNEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 39 days CUSTOMER: TNEB TRADER: NVVNL INJECTING UTILITY KYCPP,KSEB DRAWEE UTILITY TNEB KERALA CAPACITY APPROVED 150 MW DAILY PERIOD 0000-2400 HRS TAMILNADU DATE OF COMMENCEMENT 21-01-05 DATE OF EXPIRY 28-02-05… KAYAMKULAM CCGT(NTPC)

  12. STOA OF KSEB(KYCPP) - TNEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 39 daysFROM 21-01-05 TO 28-02-05, THROUGHOUT THE DAY EXPORT AT KYCPP BUS 150 MW LOSSES IN KERALA 0.75% AT KERALA PERIPHERY 148.9 MW KERALA TAMILNADU LOSSES IN SR 3.12% TN RECIEVES 144.3 MW TOTAL LOSSES FOR TRANSACTION 5.7 MW… KAYAMKULAM CCGT(NTPC)

  13. MORE DETAILS NEW STOA OF KSEB(KYCPP) - TNEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 39 daysFROM 21-01-05 TO 28-02-05, THROUGHOUT THE DAY APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION • SCHEDULING CHARGES PER DAY • Rs 3000 FOR SRLDC • Rs 3000 FOR KSEB KERALA TAMILNADU • TRANSMISSION CHARGES PER MW PER DAY • Rs 700.91 FOR CTU-SR • Rs 672.07 FOR KERALA TOTAL TRANSMISSION CHARGE PER UNIT 6/. Ps… KAYAMKULAM CCGT(NTPC)

  14. STOA CASE - 4 APTRANSCO to KPTCL 100 MW for 9 days from 0000 to 0400 hrs. and 2200 to 2400 hrs.

  15. STOA OF APTRANSCO-KPTCL, 100 MW FROM 0000 HRS – 0400 & 2200-2400 HRS KAR AP CUSTOMER: PTC TRADER: PTC INJECTING UTILITY APTRANSCO DRAWEE UTILITY KPTCL INTERVENING REGION SR CAPACITY APPROVED 100 MW DAILY PERIOD 0000 HRS – 0400 & 2200-2400 HRS DATE OF COMMENCEMENT 20-02-05 DATE OF EXPIRY 28-02-05…

  16. KAR AP STOA OF APTRANSCO-KPTCL, 100 MW FROM 0000 HRS – 0400 & 2200-2400 HRS EXPORT AT APTRANSCO 100 MW LOSSES IN SR 3.04% AT KPTCL PERIPHERY 96.96 MW TOTAL LOSSES FOR TRANSACTION 3.04 MW…

  17. KAR AP MORE DETAILS NEW STOA OF APTRANSCO-KPTCL, 100 MW FROM 0000 HRS – 0400 & 2200-2400 HRS APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION • SCHEDULING CHARGES PER DAY • Rs 3000 FOR SRLDC • TRANSMISSION CHARGES PER MW PER DAY • Rs 700.91 FOR CTU-SR TOTAL TRANSMISSION CHARGE PER UNIT 12.5/. Ps…

  18. SUMMARY OF TRANSACTIONS WITH OLD AND NEW RATES ESC TO EXIT

  19. BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF APTRANSCO – MPSEB OF NVVNL (200 MW)

  20. BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF KYCPP – TNEB OF NVVNL (150 MW)

  21. BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF WBSEB – AJMER(RAJASTHAN) (20 MW)

  22. BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF KYCPP – TNEB OF NVVNL (150 MW)

  23. BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF APTRANSCO – MPSEB OF NVVNL (200 MW)

  24. BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF WBSEB – AJMER(RAJASTHAN) (20 MW)

  25. BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OFAPTRANSCO-KPTCL, 100 MW FROM 0000 HRS – 0400 & 2200-2400 HRS

  26. BACK CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OFAPTRANSCO-KPTCL, 100 MW FROM 0000 HRS – 0400 & 2200-2400 HRS