SHORT TERM OPEN ACCESS CASE STUDIES. STOA CASE - 1. JINDAL(KPTCL) to MSEDCL 100 MW for 31 days from 0000 to 2400 hrs. STOA OF JINDAL- MSEDCL, 100 MW FROM 0000 HRS – 2400 HRS. KAR. AP. CUSTOMER: PTC. TRADER: PTC. INJECTING UTILITY JINDAL. WR GRID. MSEDCL.
E N D
STOA CASE - 1 JINDAL(KPTCL) to MSEDCL 100 MW for 31 days from 0000 to 2400 hrs.
STOA OF JINDAL- MSEDCL, 100 MW FROM 0000 HRS – 2400 HRS KAR AP CUSTOMER: PTC TRADER: PTC INJECTING UTILITY JINDAL WR GRID MSEDCL DRAWEE UTILITY MSEDCL HVDC BACK TO BACK AT BHADRWATHI IN WR INTERVENING REGIONAL LINK SR-WR INTERVENING STATE TRANSMISSION UTILITY KPTCL CAPACITY APPROVED 100 MW JINDAL DAILY PERIOD 0000 HRS – 2400 HRS DATE OF COMMENCEMENT 01-03-06 DATE OF EXPIRY 31-03-06…
STOA OF JINDAL- MSEDCL, 100 MW FROM 0000 HRS – 2400 HRS KAR AP LOSSES IN KPTCL 4.06% EXPORT AT JINDAL 100 MW WR GRID MSEDCL AT ER-SR PERIPHERY 95.9 MW HVDC BACK TO BACK AT BHADRWATHI IN WR LOSSES IN SR 3.50% AT SR-WR PERIPHERY 92.5 MW LOSSES IN WR 4% MSEDCL RECEIVES 88.8 MW JINDAL
STOA OF JINDAL- MSEDCL, 100 MW FROM 0000 HRS – 2400 HRS KAR AP APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION • SCHEDULING CHARGES PER DAY • Rs 3000 FOR SRLDC • Rs 3000 FOR WRLDC • Rs 1000 FOR KPTCL WR GRID MSEDCL HVDC BACK TO BACK AT BHADRWATHI IN WR • TRANSMISSION CHARGES PER MW PER DAY • Rs 757.04 FOR CTU-SR • Rs 1114.72 FOR SR-WR LINK • Rs 757.04 FOR KPTCL JINDAL TOTAL TRANSMISSION CHARGE PER UNIT 12.5/. Ps…
CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF JINDAL,KPTCL – MSEDCL OF PTC (100 MW)
STOA CASE - 2 KAYAMKULAM CCGP, NTPC to PSEB 150 MW for 31 days on Round the Clock basis
SR STOA OF KSEB(KYCPP) - PSEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days PSEB NR CUSTOMER: NVVNL TRADER: NVVNL HVDC BACK TO BACK AT VINDHYACHAL IN WR INJECTING UTILITY KYCPP,KSEB DRAWEE UTILITY PSEB WR INTERVENING REGION WR HVDC BACK TO BACK AT BHADRWATHI IN WR • INTERVENING REGIONAL LINK • SR-WR • WR-NR INTERVENING STATE TRANSMISSION UTILITY KSEB KERALA CAPACITY APPROVED 100 MW DAILY PERIOD 0000-2400 HRS DATE OF COMMENCEMENT 01-05-06 DATE OF EXPIRY 31-05-06 KAYAMKULAM CCGT(NTPC)
SR STOA OF KSEB(KYCPP) - PSEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days PSEB NR EXPORT AT KYCPP BUS 150 MW HVDC BACK TO BACK AT VINDHYACHAL IN WR WR LOSSES IN KERALA 0.75% AT KERALA PERIPHERY 148.9 MW HVDC BACK TO BACK AT BHADRWATHI IN WR LOSSES IN SR 3.12% AT SR-WR PERIPHERY 144.3 MW LOSSES IN WR 4.0% KERALA AT WR-NR PERIPHERY 138.5 MW LOSSES IN NR 3.0% PSEB RECIEVES 134.4 MW KAYAMKULAM CCGT(NTPC)
SR STOA OF KSEB(KYCPP) - PSEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days PSEB APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION NR • SCHEDULING CHARGES PER DAY • Rs 3000 FOR SRLDC • Rs 3000 FOR WRLDC • Rs 3000 FOR NRLDC • Rs 1000 FOR KSEB HVDC BACK TO BACK AT VINDHYACHAL IN WR WR HVDC BACK TO BACK AT BHADRWATHI IN WR • TRANSMISSION CHARGES PER MW PER DAY • Rs 757.04 FOR CTU-SR • Rs 1114.72 FOR SR-WR LINK • Rs 345.1 FOR CTU-WR • Rs 560.09 FOR WR-NR LINK • Rs 521.37 FOR CTU-NR • Rs 672.07FOR KSEB KERALA TOTAL TRANSMISSION CHARGE PER UNIT 16.8/. Ps… KAYAMKULAM CCGT(NTPC)
CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF WBSEB – AJMER(RAJASTHAN) (20 MW)
PAYMENT TERMS FOR JINDAL AND KPTCL • AS PER THE STOA TRANSACTION DAY AHEAD SCHEDULE WILL BE FINALISED. • IN REAL TIME OPERATION, IF JINDAL INJECTS MORE THAN 105% OF THE SCHEDULE IN ANY 15 MINUTE TIME BLOCK THEN PAYMENT WILL BE RESTRICTED TO 105% OF THE SCHEDULE AS PER SR UI RATE.
PAYMENT TERMS FOR JINDAL AND KPTCL MORE THAN 101% OF THE SCHEDULE IN A DAY THEN PAYMENT WILL BE RESTRICTED TO 101% OF THE SCHEDULE. (CALCULATING AS PER SR UI RATE)
PAYMENT TERMS FOR JINDAL AND KPTCL IN REAL TIME OPERATION, IF JINDAL INJECTS BETWEEN 100% TO 95 % OF THE SCHEDULE IN ANY 15 MINUTE TIME BLOCK THEN JINDAL HAS TO PAY AS PER SR UI RATES LESS THAN 95% OF THE SCHEDULE IN ANY 15 MINUTE TIME BLOCK THEN JINDAL HAS TO PAY 110% OF SR UI RATE
PAYMENT TERMS FOR KAYAMKULAM,NTPC AND KSEB IF ACTUAL GENERATION IS MORE THAN SCHEDULE IN A DAY THEN NO PAYMENT WILL BE PAID TO KAYAMKULAM, NTPC. IF ACTUAL GENERATION IS LESS THAN SCHEDULE IN A DAY THEN KAYAMKULAM, NTPC HAS TO PAY VARIABLE COST OF PLANT OR AVERAGE DAY UI RATE OF SR WHICHEVER IS HIGHER.