Nuclear Provinces 630 MW 1Unit 14,000 MW 20 Units 630 MW 1Unit
Canada Nuclear Structure • Canada has a long history of nuclear power • 1945 test reactor ZEEP at Chalk River achieved first self-sustained nuclear reaction outside the US • Nuclear is a federal responsibility • AECL is federally owned • Electricity is the responsibility of the provinces
The Players • Nuclear Utilities • Ontario Power Generation • Bruce Power • Hydro Quebec • New Brunswick Power • Atomic Energy of Canada Limited • Technology holder/Vendor • National Laboratory • Universities (UNENE) • CNSC • Industry (OCI)
The Markets • Ontario • Quebec • New Brunswick • Alberta
Ontario • Ontario electricity system was in crisis • Nuclear fleet was nearing its end of life • The coal fleet was to be closed by government policy • Transmission was insufficient to support generation renewal • Government acted
Ontario • Last summer submitted its 20 year plan (IPSP) for approval • Reduce demand through conservation • Replace coal with renewables and gas • Renew nuclear through refurbishment or new build • Implement transmission improvements to support generation and system reliability
Ontario • Refurbishment of Bruce 1&2 underway • Refurbishment of Bruce 3&4 committed • Review of Refurbishment of Pickering B • New build process announced • Tendering process underway to select technology • RFP issued for 2000 to 3500 MW • Utility to be selected • Decision expected by year end
Quebec • One nuclear station Gentilly 2 • About 3% of electricity generation • Nearing end of life • Important to grid stability • Refurbishment decision expected by this summer
New Brunswick • One nuclear station Point Lepreau • About 25% of electricity generation • Reached end of life • Shut down end of March for refurbishment • New build under consideration • Feasibility study under review for ACR-1000 • To be implemented on a private sector commercial basis • Decision expected later this year New Brunswick
Alberta • Primarily coal fired generation • Large growth due to oil sands development • Need for large amounts of gas to support oil extraction • Application for new nuclear has been submitted to the regulator • Project conceived by Energy Alberta • Bruce Power has recently purchased Energy Alberta • Project to be for 2000 to 4000 MW • To be competitively bid
Saskatchewan • 1929 Eldorado Mining began prospecting • 1953 Uranium City- first uranium mine in Saskatchewan • Canada is the largest producer of uranium from its mines in Saskatchewan • Produced 9327 TU in 2007 • Progress on Cigar Lake • Government now interested in investigating more involvement in the nuclear fuel cycle
AECL • Crown Corporation (owned by Federal Government) • Established in 1952 • Research and Development at Chalk River • Designer of the CANDU technology • Developing the ACR-1000 • Working with Team CANDU for new projects • Government review of AECL underway with the potential for partial or total privatization
Looking Forward • Refurbishments continuing in Ontario and New Brunswick • New Build • Ontario to decide on technology and owner • New Brunswick to determine new unit feasibility • Alberta considering new build
Canada’s Nuclear Future • Canada has a big nuclear future as nuclear power continues to play an important role in the energy mix • But What’s next – big questions remain • Technology – will Canada build a LWR? • Who will build in Ontario? • What is the future of AECL?
Stay Tuned2008 is expected to be a big decision year! And THANK YOU for inviting me to Miami!!