An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Basics of Demolition By Dallascontracting

  2. Each demolition project is unique and a site specific HASP and Workplan, along with an OSHA engineering survey must be developed.

  3. The typical razing of a building, structure, plant, factory, etc. is accomplished as follows:

  4. Obtain all necessary permits • Install Soil and Erosion Control Measures as necessary • Isolate demolition area / perform all utility disconnects • Perform asbestos abatement • Removal all lights, ballasts, mercury switches, freon, etc. for recycling • Removal all hazardous materials

  5. Hydraulic excavators may be used to topple one-or two-story buildings by means of an undermining process.The strategy is to undermine the building while controlling the manner and direction in which it falls.The demolition project manager/supervisor will determine where undermining is necessary so that a building falls in the desired manner and direction.

  6. Loaders or dozers may also be used to demolish a building.These loaders and bulldozers are typically equipped with “rakes” (which are thick pieces of steel which could be an I-Beam or thick steel tube) that is used to ram building walls.Skid loaders and loaders will also be used to load materials out and sort steel.

  7. In order to control dust, fire hoses will be utilized to maintain a wet demolition. Hoses may be held by workers, secured in fixed location, or attached to lifts to gain elevation.Safety is always paramount on each project. A site safety officer is assigned to each project and enforces all OSHA and client specific safety rules and regulations.

  8. For more details Visit- https://www.dallascontracting.com/services-brief-demolition-work-plan/