1 / 4

AMS-02 Rebaselining Outbrief ISS PIA/ICD & SSP MIP/ICD

AMS-02 Rebaselining Outbrief ISS PIA/ICD & SSP MIP/ICD. ISS Payload Mission Integration & Planning/OZ2 Space Shuttle Mission & Cargo Integration Office/MO3 7/15/04. JJ Conwell/MO3 281-483-1178 Robert Miley/OZ2 281-226-4968. Payload Documentation Overview. Documentation Requirements:

damali
Download Presentation

AMS-02 Rebaselining Outbrief ISS PIA/ICD & SSP MIP/ICD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AMS-02 Rebaselining OutbriefISS PIA/ICD & SSP MIP/ICD ISS Payload Mission Integration & Planning/OZ2 Space Shuttle Mission & Cargo Integration Office/MO3 7/15/04 JJ Conwell/MO3 281-483-1178 Robert Miley/OZ2 281-226-4968

  2. Payload Documentation Overview Documentation Requirements: • ISS Program & Space Shuttle Program (SSP) Requirements • Requirements ensure safety, interfaces, and operations compatibility • NSTS 1700.7B ISS Addendum “Safety Policy & Requirements for Payloads Using ISS” • NSTS/ISS 13830 “Payload Safety Review & Data Submittal Requirements” • NSTS/ISS 18798 “Interpretations of NSTS/ISS Payload Safety Requirements” • SSP 57003 “Attached Payload Interface Requirements Document” • SSP 57061 “Standard Payload Integration Agreement for Attached Payloads” • Joint Agreements required in the following disciplines • Safety requirements • Physical Interface requirements • Electrical/Thermal Interface requirements • Command & Data downlink requirements • Operational requirements • Crew Training requirements • Transportation to/from orbit requirements

  3. ISS Program Documents • Payload Integration Agreement (PIA): • Documents joint agreements to manage and execute roles and responsibilities for ISS payload integration • Schedule - SSP 57113 AMS-02 PIA • 11/21/03 - ISS Program Manager did not disqualify any AMS-02 ISS requirements or Shuttle requirements – requested coordination with SSP • 6/11/04 - Evaluation request to Space Shuttle for SSCN 6999 • 6/24/04 - Shuttle agreed to early MIP baseline development • 6/25/04 - OZ agreed to early MIP baseline proposal with SSP • 7/8/04 - OC agreed to early assignment of a Launch Package Manager • ISS AMS-02 requirements communicated to Shuttle via MIP • Implements the existing formal ISS/Shuttle process • 10/6/04 - PCB for SSCN 6999 PIA approval ISS Interface Control Document (ICD): • Defines payload hardware and software interfaces with ISS. Details ISS/payload interface verification requirements. • 2/1/05 – PECP & 2/9/05 PCB for SSP 57213 AMS-02 Hardware ICD approval

  4. Shuttle Program Documents • Mission Integration Plan (MIP): • Documents joint agreements between the ISS Program and SSP to define and execute the launch package integration requirements • Only formal mechanism for Shuttle to review and approve requirements that the ISS Program is levying on Shuttle • Schedule - • 6/24/04 - Shuttle agreed to early MIP baseline development • Mission unique MIP encompasses all requirements and constraints pertinent to the Launch Package and/or Return Complement on this flight • Implements the existing formal Shuttle process to work payload requirements and the Orbiter-to-AMS-02 ICD • Nominal MIP template: ISS submittal L-21.5 months; Shuttle baseline L-16 months • 8/10/04 - AMS-02 MIP kickoff meeting • 2/22/05 - SSP Flight Operations Integration Control Board for MIP approval Shuttle Interface Control Document (ICD): • Defines payload hardware and software interfaces with Orbiter • 5/17/05 – SSP approval of AMS-02 Hardware and Software ICD

More Related