Update on Aceh

Update on Aceh. Challenges to Reconstruction. houses needed: 150,000 units houses committed: 135,162 houses completed & under construction: 36,963 houses occupied 50-60% UN Habitat-BRR 28 Feb 2006.

damian
Download Presentation

Update on Aceh

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on Aceh Challenges to Reconstruction

  2. houses needed: 150,000 units houses committed: 135,162 houses completed & under construction: 36,963 houses occupied 50-60% UN Habitat-BRR 28 Feb 2006

  3. key challenges: material supply & demand bricks 10,000 per house 2-2.5 billion bricks demand 1.35 billion bricks capacity

  4. key challenges: material supply & demand timber 1 m3 for brick houses -structure 9 m3 as fuel for bricks 1.4 million m3 demand 50 K m3legal supply

  5. key challenges: land availability & tenure 12% land loss due to tsunami <15% land legally registered 85% land records lost

  6. key challenges: communities & coordination NGOs as “contractors” “naming & shaming” poor wat-san integration

  7. key challenges: material supply & demand timber