An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sovcomflot offshore activities development:New frontiers 27 June, 2012 Russian Petroleum& Gas Congress - 2012

  2. Agenda Corporate highlights Offshore activities Strategyvision Special highlight

  3. at a glance • 157owned and chartered in vessels • with total DWT of abt. 12 million tons(1) • Tanker owner by number of vessels • Ice-class tankers owner/operator • Aframax tankers owner/operator • MR product tankers owner/operator • Tanker owner by deadweight • Shuttle tankers owner/operator • Suezmax tankers owner/operator • Average age of SCF tanker fleet: 7 yearsMore than 8,500 seafarers and shore-based personnel are employed by SCF 1 Company of the year 1 1 1 Global Performer for the pioneering work in Arctic 3 3 4 2010 public debt deal of the year SCF is one of the world’s largest energy shipping companies, providing leading-edge integrated marine solutions to its clients Source: Clarkson research, ranked by DWT unless otherwise stated As of June 2012

  4. business platform: three core elements • Conventional shipping1 • LNG/LPG • Offshore Gas Crude Products Shuttles Services • 59 crude oil tankers • 6.9m DWT capacity • > 50% revenues from fixed rate charters • 63 product tankers • 2.7m DWT capacity • > 50% revenue from fixed rate charters • 13 shuttle tankers • 1.2m DWT capacity • World leader in ice-class shuttle tankers • Platform supply • Heavy lift (towing) • Seismics • World leading ice-class LNG fleet • 1m DWT • 100% under long-term fixed contracts Profit on vessel trading (EBIT) TCE revenue composition 2010 2011 2010 2011 SCF successfully expanded into new high value-added segments while maintaining leadership in conventional shipping • Number of vessels shown is as June 2012 and includes vessels on order.

  5. conventional energy shipping strategy Sovcomflot conventional fleet: 123 on water 6under construction Suezmax 18 VLCC 2 Aframax 42 Small/Coastal 12 LR2 6 LR1 9 MR 38 • Managed fleet size/structure, taking into account market environment and fleet age profile • Continued commitment to quality and safety of operations • Reliance on time charters to generate fixed income, less exposure to spot market • Focus on ice shipping from Russian ports as a “pocket of opportunity” SCF strategy is to maintain leadership in the conventional sector,while maintaining highest standards of quality and operational excellence

  6. LNG: attractive segment with high growth potential • Unique Positioning in the Sector • Global Geography of Operations • SCF pioneered Russia’s seaborne natural gas exports with the first LNG shipment from Sakhalin 2 plant in March 2009 • Currently operating a fleet of 6 LNG and 2 LPG carriers • 2 LNG vessels recently ordered under 15 yrs TC with Gazprom Group + 2 for a long-term TC with Royal Dutch Shell • 2 LPG vessels recently ordered under 10 yrs TC with Sibur • 100% of the fleet under long-term fixed contracts Yamal LNG Algeria– Spain/France Sakhalin – China/India/Japan/Korea Qatar– Spain/Italy Egypt– Japan/Korea Trinidad– Spain/North America Indonesia– Korea/Mexico E.Guinea– India Escobar Project Argentina • Gas Fleet(1) • 4 NewbuildingsLNG Carrier, Membrane systemCapacity- 170,000 cbmIce-class 1C • Participation in Key LNG Development Projects • Sakhalin-2 Project • An oil, gas, and condensate development project in Russia operated by Sakhalin Energy Investment Company Ltd, with annual LNG production at 9.6 M tons. • Tangguh Project • A gas development in Eastern Indonesia controlled by an international consortium of The Tangguh Production Sharing Contractors, led by BP with annual LNG production of 7.6 M tons • GNL Escobar Project • Feeder vessel operations and ship-to-ship lightering to regas vessel supplying gas to Buenos Aires, Argentina • Yamal LNG Project • Development of integrated marine logistics for transportation of LNG in the heavy ice and harsh environment of the Russian Arctic • «SCF Arctic» /«SCF Polar»LNG Carrier, Membrane systemCapacity- 71,200 cbmIce-class 1C • «Tangguh Towuti» /«Tangguh Batur» LNG Carrier, Membrane system Capacity – 145,700 cbm • «Grand Aniva» / «Grand Elena»LNG Carrier,Spherical systemCapacity- 145,000cbm Ice-class1C • «SCF Tomsk» / «SCF Tobolsk»LPG Carrier, HandysizeCapacity- 35,000cbm SCF Sovcomflot gas strategy 2011-2017: pursuit of global LNG projects in preparation for future Russian LNG (Shtokman, Yamal, Sakhalin expansion) • 2 x LPG Carrier, Capacity - 20,600 cbm • Ice-class 1B • TC with Sibur , delivery in 2013

  7. SCF Peer Group Performance SCF remains the only sizable tanker company reporting black numbers * Gross revenues

  8. Contracted future revenues • Total contracted future revenues for the period from 01.01.2011 are over USD 4.9 bln • Significant growth of long term contract coverage supplied with increase of industrial projects portfolio, particularly in operation on Russian offshore and LNG transportation

  9. Newbuilding programme

  10. Agenda Corporate highlights Offshore activities Strategyvision Special highlight

  11. Offshore services – a new growth platform for 2006 2007 2008 2009 2010 2011 • Fleet: • High-endice-class 3D vessel • Projects • Shatskiy Ridge • Fleet: • 13 tankers • Total capacity 1,2 mt DWT • 100% ice-class • Projects • Sakhalin-1 (De-Kastri) • Sakhalin-2 • Varandey • Prirazlomnoye • Fleet: • 2 ice-class PSVs operative • 2 ice-class PSVs on order • Heavy lift (towage) project • Projects • Sakhalin-1 • Sakhalin-2 Shuttle tankers Platform supply / Services Seismics SCF goal is to become a strong Arctic-focused offshore player

  12. 10-15 year time charter with Naryanmarneftegaz • (JV – Lukoil/ConocoPhillips) • Shipments began in June 2008 • 3 highly specialised SCF Panamax shuttle tankers chartered from SCF: • 70,000 DWT tonnes • 1A Super Ice-class • ICE Azipod propulsion 2 x 10 MW • 1.5m ice-breaking capability • Self-supporting ice navigation • Winterisation package -45ºc • LxBxH = 250m x 32m x 21m • Draft 14m. Varandey

  13. Sakhalin 1 • Oil and gas project operated by Exxon Neftegas Ltd • International consortium: Rosneft, Exxon, Sodeco, ONGC • SCF has 15-year time charter • Oil transported from DeKastri • 5 Aframax ice class 1C/1A (hull) shuttle tankers in use: • Winterisation package (-30º c) = year-round operations: • Introduced into the Class Rules thanks to co-operation between SCF, DNV, ExxonMobil • Sakhalin 2 • Oil, gas and condensate project operated by Sakhalin Energy Investment Company Ltd • International consortium: Gazprom; Shell; Mitsubishi; Mitsui • Gas exported via LNG plant and terminal at Prigorodnoye • Pioneered Russia’s seaborne gas exports with the first LNG shipment from Sakhalin 2 plant in March 2011 • 2 LNGC 1C Ice class vessels. Sakhalin 1 and 2

  14. First offshore oil production project in Barents Sea • Long-term time charter with Gazprom Neft Shelf (former Sevmorneftegaz) • Critical mass of shuttle tankers in Pechora Sea area with potential for optimisation between neighbouring projects • 2 Super Panamax-size shuttle tankers (70,000 DWT): • 1A Super Ice-Class • ICE AZIPOD propulsion 2 x 8.5 MW • 1.2 metre ice breaking capability • Self-supporting ice navigation • -40ºc winterisation package • LxBxH = 257m x 34m x 20.8m • Draft 13.6 m. Prirazlomnoye

  15. Seismic Project:About the vessel • Vessel with all equipment delivered in August 2011 • Innovative ULSTEIN X-BOW® design • Ice class - 1A, Winterized basic • 8 Streamer vessel capable to tow with separation up to 200m • New “eco” design (DNV CLEAN DESIGN), economy fuel consumption • Diesel-electric propulsion, high specification catalytic convertors, double hull and advanced ballast water treatment / bilge water cleaning systems

  16. Agenda Corporate highlights Offshore activities Strategy vision Special highlight

  17. The Russian Arctic basin – hydrocarbon potential • Arctic has some 24% of global undiscovered resources of hydrocarbons (Source: Statoil) • Undiscovered oil & gas north of the Arctic Circle = 90 billion barrels of oil, 1,669 trillion cubic feet of natural gas; approx. 84% expected from offshore areas (Source: U.S. Geological Survey) • Russia holds ~24% of global gas and ~6% of global oil reserves (Source: BP, 2011) • Over 20% of Russia located North of the Polar Circle • Arctic/sub-Arctic regions of Russia include: • 90% of Russian gas reserves • 60% of Russian oil reserves Figures indicate located and yet to find reserves in billion BOE SCF’s asset base, track record, skill set and reputation put the company in prime position to provide services for Russia’s future Arctic offshore projects

  18. Current and planned future Russia/CIS offshore projects Current projects Projects expected by 2017 Shtokman Russian Arctic Prirazlomnoye Russian Far East Black Sea / Caspian Sakhalin Russian offshore opportunity is made up of ~50 projects, estimated reserves of >30 btoe, and USD 25-30 billion offshore services revenue potential

  19. aspiration for 2017: a balanced and diversified portfolio Business segment Target 2017revenue share Strategic aspiration Upstream Downstream Offshore services • Strong offshore player, leveraging SCF’s marine skills and operational excellence • Focused presence in • Russian offshore • Harsh environment 40% • Leading carrier of Russian LNG • World leader in harsh environment LNG shipping Gas 20% Crude tankers Product tankers Offshore services Seismics Chemical tankers • Leading conventional fleet owner/operator • World’s leading ice-class tanker operator • Commitment to industrial shipping Conventional shipping LPG Shuttle tankers LNG 40% SCF is aiming to achieve scale and segment leadership across the board

  20. strategic horizons and growth aspirations Horizon 3 2015-2020 Horizon 2 2012-2015 • Create viable growth options • New upstream-related business areas? • New technologies? Horizon 1 2011-2012 • Build emerging businesses • Expansion in specialized energy shipping areas, based on SCF marine skills (shuttle tankers and LNG) • Streamlining of conventional business • Building position in selected upstream-related areas Sovcomflot 2017 aspirations: • USD 2 billion turnover(CAGR ~11-12%) • USD 1 billion EBITDA • USD 500 million profit • ROCE 10-12% • Extend and defend • core businesses • Corporate strategy review • Ongoing operational improvement • Organizational fine-tuning 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

  21. Agenda Corporate highlights Offshore activities Strategy vision Special highlight

  22. Tow out of “Berkut” Gravity Based Structure from dock

  23. Towing and Installation of Sakhalin-1 “Arkutun-Dagi” GBS • One of the biggest towed objects in the world - 130 000 tons • Distance: 1025nm; Tow speed: 3,5 knots; Duration: 12 days; Positioning shall be + / - 3.0 meter • Number of vessels employed – 15 (incl. five AHTS, OSV, GSV, Flexible fallpipevessel, etc) • Project team – total: 65 pers. (incl. 20 Russians) + crews + support from SCF and VO HQs • 110 000 tons should be place on sea bottom to make scour protection SCF’s asset base, track record, skill set and reputation put the company in prime position to provide services for Russia’s future Arctic offshore projects

  24. Место установки основания платформы Маршрут буксировки погружаемого основания платформы «Беркут» Окончание буксировки 15.06.12, 21:27 МСК 14.06.12 17:00 МСК 13.06.12 17:00 МСК о. Сахалин Начало буксировки 02.06.2012 г. 23:40 МСК Окончание буксировки 15.06.2012 г. 21:27 МСК Общее расстояние буксировки 1025 миль Общее время буксировки 12 дней 21 ч. 47 мин. Средняя скорость буксировки за сутки3,30уз 12.06.12 17:00 МСК 11.06.12 17:00 МСК 10.06.12 17:00 МСК 07.06.12 17:00 МСК 09.06.12 17:00 МСК 08.06.12 17:00 МСК Начало буксировки 02.06.12, 23:40 МСК 06.06.12 17:00 МСК 05.06.12 17:00 МСК п. Восточный 15.06.2012 04.06.12 17:00 МСК 03.06.12 17:00 МСК

  25. Scope of marine works Marine operations: • Route surveying • GBS lift-off and float out of dock • GBS tow to Field and positioning • GBS set-down and grouting installation • GBS Subsystem decommissioning and preparation • Installation of scour protection 6 2 4 4 3

  26. Thank you for your attention!