Lower South Fork Clearwater River/ Lolo Creek 2010 Accomplishments

Lower South Fork Clearwater River/ Lolo Creek 2010 Accomplishments. 6 passage barrier replacements 1 passage barrier removal 36.8 miles road decommissioning 15 miles road surveyed and staked. Lower South Fork Clearwater River/ Lolo Creek 2010 Accomplishments. 24 miles fence maintained

dane-cote
Download Presentation

Lower South Fork Clearwater River/ Lolo Creek 2010 Accomplishments

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lower South Fork Clearwater River/ Lolo Creek2010 Accomplishments • 6 passage barrier replacements • 1 passage barrier removal • 36.8 miles road decommissioning • 15 miles road surveyed and staked

  2. Lower South Fork Clearwater River/ Lolo Creek2010 Accomplishments • 24 miles fence maintained • 18 miles trail maintained • 160 feet puncheon bridge replaced • 9,120 trees planted

  3. Lower South Fork Clearwater River/ Lolo Creek2010 Accomplishments 105 Acres treated for noxious weeds 15 reaches monitored 43 culvert sites monitored 22 road decommissioning sites monitored