LHD1 LHD3 LHD9 LHD11 LHD17 LHD20 Overview • Load-Haul-Dump Machines • Hydraulic Failure • Time between Failure • Machine Distribution • System Equation • MTTF & MRL
Methodologies Rs := 1-(1-R1)*(1-R3)*(1-R9)*(1-R11)*(1-R17)*(1-R20) Rs, Reliability of the System R1, Reliability of LHD1 R3, Reliability of LHD3 R9, Reliability of LHD9 R11, Reliability of LHD11 R17, Reliability of LHD17 R20, Reliability of LHD20
Results • Reliability Curves for each machine • LHD1, LHD3, LHD9, LHD11, LHD17, LHD20 • System Reliability Curve • System Failure Curve
Conclusion • The MTTF for the system is 380.82 hours. • Parallel System • Extend Reliability • Allow for Maintenance • Machine Distribution • Lognormal • Weibull MRL of System