Status of S1-Global. Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes. Eiji Kako (KEK, Japan). Slide-Jack Tuner Assembly. 23rd, March 2010’. MHI-05. MHI-06. Piezo Tuner & Load Sensor. Slide-Jack Tuner Center. Slide-Jack Tuner Assembly. MHI-07.
E N D
Status of S1-Global • Slide-Jack Tuner Assembly • TTF-III Warm Coupler Assembly • Connection of Beam Pipes Eiji Kako (KEK, Japan) Webex meeting S1-G Global Design Effort
Slide-Jack Tuner Assembly 23rd, March 2010’ MHI-05 MHI-06 Piezo Tuner & Load Sensor Slide-Jack Tuner Center Webex meeting S1-G Global Design Effort
Slide-Jack Tuner Assembly MHI-07 23rd, March 2010’ MHI-09 Piezo Tuner & Load Sensor Slide-Jack Tuner End Webex meeting S1-G Global Design Effort
Schedule of Warm Coupler Assembly 15 Mon ; am./pm. Arrival of Denis Kostin from DESY (Installation of Cryomodule-C in Tunnel) 16 Tue ; am. Meeting for Warm coupl. Assem. @ STF pm. Check &Preparation of Coupler Parts Set-up of Clean-booth & Pumping system 17 Wed; am./pm. Assembly of Warm Coupler (Z109) Assembly of Warm Coupler (Z108) 18 Thu ; am./ pm. Assembly of Warm Coupler (ACC011) Assembly of Warm Coupler (AES004) 19 Fri ;am./pm. Disassembly of Warm Coupler (AES004) Reassembly of Warm Coupler (AES004) Webex meeting S1-G Global Design Effort
TTF-III Warm Coupler Assembly TTF-III Warm Coupler Photos by Toge-san Webex meeting S1-G Global Design Effort
TTF-III Warm Coupler Assembly Webex meeting S1-G Global Design Effort
TTF-III Warm Coupler Assembly March 19th , 2010’ Denis Kostin (DESY) Webex meeting S1-G Global Design Effort
TTF-III Warm Coupler Assembly Z109 Z108 ACC011 AES004 March 23, 2010’ Webex meeting S1-G Global Design Effort
Connection of Beam Pipefor Cryomodule-C Beam Pipe Scheduled in April, 6th - 7th Webex meeting S1-G Global Design Effort