1 / 6

Review Tabled Agenda Item: Additional M&V Data on Ag Pump VFD Projects

Review Tabled Agenda Item: Additional M&V Data on Ag Pump VFD Projects. Determination of M&V requirements and/or deemed savings Regional Technical Forum August 4 th , 2009. Background: July RTF Meeting.

danika
Download Presentation

Review Tabled Agenda Item: Additional M&V Data on Ag Pump VFD Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Review Tabled Agenda Item:Additional M&V Data on Ag Pump VFD Projects Determination of M&V requirements and/or deemed savings Regional Technical Forum August 4th, 2009

  2. Background: July RTF Meeting • BPA requested a deemed savings number for VFD’s in agriculture pump applications. BPA thinks a deemed number would encourage more projects since the current M&V requirements deter many projects. • BPA Data: • Proposal: Deem savings at 500 kWh/year/hp • Issues Raised by the RTF • Operating hours vary based on crop type, weather, etc. • Not a lot of data to base a deemed savings from • Data do not show a linear relationship between savings and pump horsepower • Meeting Conclusion: Table the issue until we see PacifiCorp’s project data

  3. PacifiCorp’s Data

  4. All Savings Data

  5. Cost Data

  6. Recommended Options Option 1: • Use data to generate a deem savings table for pumps 500 hp and less. • Allow all projects to claim the deemed savings value, based on pump size rating. • Pumps less than 25 hp do not qualify and pumps greater than 500 hp require M&V. • Require pre and post M&V on 20% of the projects (selected randomly). • Revise deemed savings estimates in 2 years, based on M&V data. Option 2: • Do not deem energy savings at this time • If interest, RTF will review M&V data again in 2 years for merits of deeming • Continue to require custom project M&V Note: Preliminary estimated 6th Plan cutoff for cost-effectiveness is about 60 to 70 mils/kWh for non-lost-opportunity measures.

More Related