1 / 2

National Guard Aviation Proposal

National Guard Aviation Proposal. Modify Active Duty (AD) Army Aviation proposed plan, (20 total ARBs in the Active Component only.)

danil
Download Presentation

National Guard Aviation Proposal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. National Guard Aviation Proposal • Modify Active Duty (AD) Army Aviation proposed plan, (20 total ARBs in the Active Component only.) • The National Guard (NG) Modification would be 10 NG Combat Aviation Brigades (CAB) instead of 11 NG Aviation Brigades (AB). (Dropping 1 AB saves $100 million annually.) • 10 NG CABs will save 1+ BILLION DOLLARS the first year, and approximately $0.5 Billion annually • 20 CABs can be purchased for less than Active Duty Aviation Proposal V 1.0

  2. National Guard Aviation Proposal How Cost Savings are Realized: AD ARB has an annual cost of $77 Million. NG ARB has an annual cost of $32 Million. NG saves $45 Million per ARB. National Guard ECAB costs $120-130 million. Subtract ARB cost (32 Million) from ECAB to get cost of NG AB. Actual Cost of NG AB ≈ $90 - $100 million AD Proposal (No NG ARBs) Costs 10 AD CABs with 20 ARB/ARSs ≈$ 4.51 billion 13 NG BDEs (10 ABs, 2 TABs, and 1 S&S BDE) = $0.88 billion AD Proposal Total Cost: $5.39 billion NG Proposal Costs: 10 AD CABs with 10 ARBs = $ 3.74 billion 10 NG CABs with 10 ARBs = $ 1.19 billion NG Proposal Total Cost: = $ 4.93billion Current Active Duty Proposal = $5.39 B (less) National Guard Proposal = $4.93 B Net Annual Savings $460 million Additional One-Time Cost Savings: Re-Training Costs of NG Aviation $1 million per Aviator X (8 ARB X MTOE ≈ 500 Aviators) = $500 million NG Proposal Saves $1 Billion for the first year, and thereafter approximately $0.5 Billion annually. V 1.0

More Related