1 / 16

SIERRA LEONE MINING ENERGY / OIL & GAS AND INFRASTRUCTURE INDABA 2013

SIERRA LEONE MINING ENERGY / OIL & GAS AND INFRASTRUCTURE INDABA 2013. MINISTRY OF TRANSPORT AND AVIATION’S PRESENTATION Minister – Mr. Leonard Balogun Koroma. STRATEGIC PRIORITIES FOR THE AGENDA FOR PROSPERITY(2013-2017). ROAD TRANSPORT SECTOR Develop the road traffic crashes Data base

dante
Download Presentation

SIERRA LEONE MINING ENERGY / OIL & GAS AND INFRASTRUCTURE INDABA 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SIERRA LEONEMINING ENERGY / OIL & GAS AND INFRASTRUCTUREINDABA 2013 MINISTRY OF TRANSPORT AND AVIATION’S PRESENTATION Minister – Mr. Leonard BalogunKoroma

  2. STRATEGIC PRIORITIES FOR THE AGENDA FOR PROSPERITY(2013-2017) ROAD TRANSPORT SECTOR • Develop the road traffic crashes Data base • Achievement of the five pillars on the UN Decade of Action for road safety, reducing road traffic crashes to 50% by 2015 • Nationwide vehicle testing using modern testing equipment • Introduction of Road Safety Curricula in schools • Introduction of Public Haulage Services • Development of National Transport Policy and Urban Mobility Plan • Introduction of school bus services • Introduction of bus services for the physically challenged • Introduction of luxury coaches • Achievement of the national road safety policy and strategic plans • Introduction of provincial city bus services

  3. STRATEGIC PRIORITIES FOR THE AGENDA FOR PROSPERITY(2013-2017) MARITIME SECTOR • Rehabilitation of the Kissy Oil Jetty • Construction of a new oil jetty • Construction of a new port AND industrial city. • Installation of Navigational Aids in all riverine areas • Institutional strengthening in maritime sector • Dredging to accommodate bigger ships • Introduction of ferry services along the coasts to decongest the roads • Establish a shipping line carrying the national flag through public private partnership

  4. STRATEGIC PRIORITIES FOR THE AGENDA FOR PROSPERITY(2013-2017) AVIATION SECTOR • Institutional strengthening of the Sierra Leone Civil Aviation Authority • Establishment of national airline through public private partnership • Construction of new airport in the mainland and an AIRPORT CITY. • Rehabilitation of all domestic airstrips • Expansion of cargo warehouse facilities at FNA

  5. STRATEGIC PRIORITIES FOR THE AGENDA FOR PROSPERITY(2013-2017) RAIL TRANSPORTATION SECTOR • Conduct nationwide feasibility study for the reintroduction of public railway transportation services • Expansion of private rail way services(mining companies) to service other parts of the country to enhance transportation of passengers and goods

  6. POTENTIAL FLAGSHIP PROJECTS/PROGRAMMES FOR THE AGENDA FOR PROSPERITY(2013-2017) ROAD TRANSPORTATION SECTOR • Reduction of road traffic crashes to 50% by 2015 • Expand public transport network to all towns • Construction of roads for national and regional connectivity MARINE TRANSPORTATION SECTOR • Construction of a new port in the south of Sierra Leone • Expansion of the existing port. • Complete the transformation of the port from a service port to a landlord port. • Establish a shipping line carrying the national flag through public private partnership.

  7. POTENTIAL FLAGSHIP PROJECTS/PROGRAMMES FOR THE AGENDA FOR PROSPERITY(2013-2017) AVIATION SECTOR • Construction of a new airport on the mainland (show Map and video). • Construction of an airport city zone. • Establishment of a national airline on a Public /private partnership basis RAIL TRANSPORTATION SECTOR • Re-introduction of public rail transportation services

  8. MAP OF THE DESIGNATED AIRPORT ZONE MTA Mamamah Presentation

  9. Airport Location Diagram MTA Mamamah Presentation

  10. Aerial View of Airport MTA Mamamah Presentation

  11. Geographic Sketch Map MTA Mamamah Presentation

  12. Master Plan Designated Zones MTA Mamamah Presentation

  13. Master Plan Layout Design (Basic) MTA Mamamah Presentation

  14. Future expansion plan (Basic) MTA Mamamah Presentation

  15. Expected development in the aviation Zone MTA Mamamah Presentation

  16. SIERRA LEONEMINING ENERGY / OIL & GAS AND INFRASTRUCTUREINDABA 2013 THANK YOU INDABA 2013 MTA Mamamah Presentation

More Related