An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Planning and Environmental Guidance For Airport Property Mineral Extraction

  2. Recently Published Guidance • Details outlined in FAA Eastern Region Airports Division Sponsor Guide (Updated 11/16/10) • Sponsor must remain in compliance with federal obligations and safety requirements • All revenue generated by mineral extraction must stay on and be used for airport purposes only

  3. Required Sponsor Actions • FAA Environmental Determination • Construction Safety Phasing Plan (CSPP) • ALP Revision

  4. Required Sponsor Submittals (Cont‘d) • Copy of Drilling Permits • Additional Information as spelled out in the guidance

  5. FAA Environmental Determination • Contact your Airports District Office (ADO) Environmental Protection Specialist (EPS) to Scope • Environmental Assessment Required for National Environmental Policy Act (NEPA) Compliance • FAA will make a Finding/Determination

  6. Keys to Obtaining Timely Environmental Determinations • Early Contact with ADO Project Manager and EPS • Early Coordination with Resource & Permitting Agencies is Critical

  7. The Environmental Assessment • Based on Preliminary System Layout and Design • Discusses Affected Environment, Required Permits • Commits to Avoidance, Minimization & Mitigation (where necessary)

  8. The Environmental Finding/ Determination Process • Determination Likely a Finding Of No Significant Impact (FONSI) • FONSI will require Supplemental Environmental Analysis (as necessary) to address Specifics/Actual Site Development • Supplemental Analysis must be Consistent with EA • Construction will not be Authorized without FAA Concurrence

  9. Airport Layout Plan (ALP) Update • Airport Sponsor’s obligation (Grant Assurance #29) • Show all permanent above-grade improvements • FAA Form 7460-1 to coordinate airspace review and determination • “Pen & Ink” Change to ALP

  10. Construction Safety Phasing Plan (CSPP) • Safety is critical! • CSPP addresses all aspects of construction • Duration and work schedules • Access routes for construction equipment • Height of equipment and lighting / flagging requirements

  11. Safety Concerns • Headlines like “Cause of Western PA Gas Well Fire Still Unknown” and “Three Burned at Marcellus Shale Drilling Site near Avella” should make you think about what could happen at drilling sites • Besides the drilling site, pipelines will be connecting your wells and traversing your property

  12. Questions