An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Readout Electronics for Upgrading of BESIII End-capTOF Chunyan Yin University of Science and Technology of China.

  2. Outline BESIII and Time-of-Flight Readout System End-cap TOF(ETOF) Upgrade BESIII ETOF Readout Electronics for Upgrading Electronics test of TDIG module 2011/04/1 2

  3. BESIII and Time-of-Flight Readout System Fig.1. BESIII cutaway diagram • BESIII is a new detector which aims mainly to measure and identify a substantial fraction of the particles(PID) produced in electron positron collisions. • The TOF detector is the major system for PID in the BES III 3 2011/04/1

  4. In a BESIII TOF detector, a total of 448 PMTs have been installed in barrel and end-cap sections. 448 channels’ readout system is mainly housed in two VME64xP crates The whole TOF readout system has been installed in the spectrometer and met the requirement of the physics experiments. The system accomplished to measure the arrival time of PMT signals from the TOF detector and achieved a timing resolution of 25 ps. BESIII andTime-of-Flight Readout System Fig.2 Block diagram of BESIII TOF readout system Fig.3. TOF readout system crate(VME64xP) crate with all modules installed 2011/04/1 4

  5. BESIII and Time-of-Flight Readout System • Publication: • Shubin Liu, Changqing Feng, et al. BES III Time-of-Flight readout system. IEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 57, NO. 2, APRIL 2010: 419-427; • Changqing Feng, Shubin Liu , et al. Electronics of BESIII TOF Monitor System. IEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 57, NO. 2, APRIL 2010:463-466; • Hao Li, Shubin Liu, et al. TOF Clock System for BES III. IEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 57, NO. 2, APRIL 2010: 442-445; • F.A. Harris, J.W. Kennedy, et al. BES3 time-of-flight monitoring system. Nucl. Instr. and Meth. A 48477(2008); 2011/04/1 5

  6. BESIII ETOF Upgrade • Target: Intrinsic time resolution < 50 ps, total time resolution < 80 ps, corresponding to a K/pi separation capability up to >1.4 GeV (95%C.L.). • Intrinsic(Pi/K): • 90ps -> 50ps • Total(Pi/K): • 138ps -> 80ps • PID of Pi/K @ 2ơ: 1.1GeV/c -> 1.4 GeV/c • Multigap Resistive Plate Chamber(MRPC) technology, is proposed to be the detector 2011/04/1 6

  7. Multi-gap Resistive PlaneChamber MRPC is major new detector technology, which is a stack of resistive glass plates with a series of uniform gas gaps. Thin gap -> fast signal and good time resolution Multi gaps -> increase the signal and efficiency Fig.4 The structure of MRPC 2011/04/1 7

  8. Layout of End-cap MRPC In the end-cap section, the double layers of MRPC are designed. End-cap section will be composed of 72 MRPC modules 36 modules are located at top, the others are at bottom. Fig.5 Layout of End-cap MRPC 2011/04/1 8

  9. BESIII ETOF Readout Electronics for Upgrading • The readout electronics system contains several modules: • FEE(Front-End Electronics) module(IHEP): Amplifies and discriminates the MRPC signal using NINO • TDIG(Time-digital)module (USTC): Receives and digitalizes the signal from FEE by 9 HPTDC chips with the resolution of less than 20 ps • CTTP(Coincidence-threshold-test-power) module(USTC): Provides power, test signal and etc.to FEE module. • Clock Master module Fig.6 Block diagram of Time-of-Flight readout system 2011/04/1 9

  10. BESIII ETOF Readout Electronics for Upgrading Fig.6 Block diagram of Time-of-Flight readout system • Each MRPC module includes 24 detector channels;FEEmodule:24 channels;TDIGmodule:72 channels • The TOF electronics should process 1728 (24*72 )channels signal • The readout electronics system includes: • 72 FEE modules will be located inside of the spectrometer • 24 TDIG modules and 2 CTTP modules are essential and are located outside of the spectrometer • 2 VME crates are required for east and west ETOF, each crate contains12 TDIGmodules+ 1 CTTP module + 1 Clock module 2011/04/1 10

  11. TDIG module Fig.7 Block diagram of TDIG module • Each TDIG module receives and digitalizes the signals from FEE using 9 HPTDC chips • HPTDC runs in very high resolution mode and achieves time measurement with the resolution of less than 20 ps • Each TDIG: Corresponding to 3 MRPC modules and importing 72 channels • Based on VME Bus • FPGA packs and transmits the data to a DAQ system via CPLD and VME bus • CPLD configures the FPGA on-line and is the interface between VME bus and TDIG module 2011/04/1 11

  12. Status of TDIG module Design • The design of TDIG module have been accomplished • Major chips run well and meet the demand • The resolution of TDIG module has been tested and meets the requirement basically Fig.8 TDIG module 2011/04/1 12

  13. Electronics test of TDIG module RMS=15.9715ps Fig.9 Cable delay test for readout system resolution 2011/04/1 • Using “cable delay test”to test the timing resolution of the TDIG module • The histogram chartobtained for the time measurement of one channel is shown in Fig. 9. 13

  14. Summary MRPC technology meets the demand of the BESIII ETOF upgrading ETOF Readout Electronics system is designed The whole electronics system will be installed and tested 2011/04/1 14

  15. Thanks! 2011/04/1 15