An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. X-Ray Gratings MissionStudy Summary Team Lead Mark Steiner 19 – 23 March 2012

  2. MDL Mission Study Summary • MDL developed mission concept for Off-Plane (OP) configuration, based on customer inputs • No major issues identified • MDL developed 1st order subsystem effects of going to CAT configuration • Each subsystem identified direct impacts on them • No evaluation of effects across system boundaries. Examples: • Power not rolled up to system level and then reflected in new power system or thermal designs • Mass not rolled up to system level and then reflected in new ACS or thermal designs • No formal, final report out to customer team • MDL concentrated on OP configuration, CAT effects, and then capturing information in their presentations • Presentations were reviewed by MDL team for internal consistency on Friday with customer attendance, but MDL team did not go through design rationales, for example • Delta options identified for last X-ray mission study (“Delta” week) • Move OP design from L2 to LEO • Further develop CAT design • Concentrate on reducing mission cost • Decision to be made at later date

  3. Mission Summary – Final (same as Monday) Orbit parameters – L2- 800,000 km LV – Falcon 9 Launch date – June 11, 2021 Mission Lifetime – 3 yr /5 year goal Mass estimate – payload: 198 kg (Instrument) 245 kg (X-Ray Mirror) – 442 kg total Power estimate – payload: 222 W (Instrument) , 213 W (X-Ray Mirror) – 435 W total Mission class – B Disposal plans – None Needed at L2 (MDL to confirm) Study name: MDL X-ray Grating WBS: 244904.04.10.01.02 ”MDL X-ray Grating” in remarks

  4. MDL Areas of Concentration/Study Drivers • Nominal mission implements the Off Plane Grating Instrument Concept • Investigate impact of implementing alternate Grating Instrument (CAT grating) • Similar operating concept , similar interface parameters • Any changed interface parameters are lessened with the CAT instrument concept • Comparison of SC interface parameters will be provided at the MDL CAN A SECOND SC CONCEPT BE GENERATED DURING THIS MDL STUDY, IMPLEMENTING THE CAT GRATING INSTRUMENT Or alternately • Nominal Mission concept has OP Grating Instrument implemented • However the SC must accommodate the CAT instrument concept with minimal modification • Other Areas of Focus • Use of Solar Panels to balance CP-CG offset • Solar Panels act as FMA Sunshade • Adapt AXSIO inner Mirror purge cover for this SC concept • Need for heater power on the SC structure adjacent to FMA to maintain FMA thermal requirements

  5. Study Plan for the week –Final (same as Tuesday) • Monday AM: review study expectations and identify key issues PM: 1) define ConOps 2) discuss derived subsystem requirements and ask questions • Tuesday AM: System drivers – TBD subsystems PM: Start subsystem checks • Wednesday AM: I&T Flow, Mission Ops PM: Finish Off-Plane (OP) design • Thursday AM: Examine CAT configuration PM: Finish 0th order quantization of CAT configuration (no separate MEL) • Friday Final chart walk-through with customer team (not a presentation, consistency check) • Monday following 1) Lessons learned, process improvements, lab status, etc. 2) Finalize presentations and wrap up the study