An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NCR Process Bongi Tshabalala Quality Assurance Engineer T&Q Department

  2. Outline 1 Process Map for issuing of NCR’s 2 NCR types / Classes / Categories 3 Response Time 4 When must a NCR be raised? 5 Issuing of NCR forms from pre-printed books

  3. 1 Process Map for issuing of NCR’s Forward to the T&Q Webmaster (T&Q-QAE) Update the website (Webmaster) ID the Non-conformance discuss with the recipient (Originator) Update the Database and Generate the T&Q ref number / Track the changes (T&Q-QAE) A Copy to T&Q QAE (Originator) Analysis and present to the forums (T&Q-QAE) Complete the NCR Form (Originator) Acknowledgement of receipt (Recipient) Signed off & forward the completed NCR form to T&Q QAE (Originator/ custodian) CA Implemented within a given time (Recipient) Yes Issued to the Recipient (Originator) Implement the CA (Recipient) Follow-up (Originator / Custodian) Custodians: Safety = Risk Management Department Environmental = Risk Management Department Construction Quality = Manager of the Project Material design or fabrication = T&Q (QAO) Late Deliveries  = Procurement Department Escalate to recipient’s management, then to SEC for supplier / contractors NCRs (Originator / Custodian) No A Copy to the Custodian (Originator)

  4. 2 NCR types/ Classes /Category NON-FULFILLMENT TO: • Safety requirement • Environmental requirement • Pre-determined process • Construction quality • Material handling • Material design or fabrication • Arranged delivery date

  5. 3 Response Time • Response and corrective action time for Safety Related NCR ? • 24 Hours • Response time for any other NCR’s ? • 2 weeks • Corrective Action time for any other NCR’s ? • 1 month • Can the originator influence the response time? • Yes

  6. 4 When must a NCR be raised? For construction quality defects: • If defects are not rectified within a specified time • Repeat defects on projects • Defects noted at and after the handover phase of the project. For NC material supplied: • For material that does not conform to the Eskom’s specification or • Where the supplier fails to meet arranged delivery date without notifying Eskom. For other NCR’s, • the originator must issue a NCR on discretionary basis.

  7. 5 Issuing of NCR forms from pre-printed books

  8. Thank you