Status and Plans DCS workshop 16.9 2002 L.Jirdén. Budget Status Planning Goals for end 2002. DCS budgeting. Total DCS budgets in MOU very approximate Old and incomplete figures Not clear what they cover Update requested in each URD No answers yet… Simple excel form to complete
E N D
Status and PlansDCS workshop 16.9 2002 L.Jirdén • Budget • Status • Planning • Goals for end 2002
DCS budgeting • Total DCS budgets in MOU very approximate • Old and incomplete figures • Not clear what they cover • Update requested in each URD • No answers yet… • Simple excel form to complete • Two distinct partitions: • Detector DCS costs • Central DCS costs • Spending profile also needed
Budgeting guidelines ECS DCS Detectors & services DET GAS INF DSS MAG … ITS TPC TRD TOF HMP PHO ZDC FD PMD MU EMC COS ~ 19 sub-detectors SPD SDD SSD RO FC CAL CPV FMD T0 V0 TRI TRA ~100 sub-systems … … … … 2-300 device units … … … 2-300 physicaldevices > 105 channels > 106 parameters
Budgeting guidelines Central DCS ECS DCS Detector DCS Detectors & services DET GAS INF DSS MAG … ITS TPC TRD TOF HMP PHO ZDC FD PMD MU EMC COS ~ 19 sub-detectors SPD SDD SSD RO FC CAL CPV FMD T0 V0 TRI TRA ~100 sub-systems … … … … 2-300 device units … … … 2-300 physicaldevices > 105 channels > 106 parameters
Budgeting guidelines Configuration DB, Archives, Storage Log files, etc. WAN LAN LAN Controller/ (LHC, Safety, ...) Other systems PLC VME Field Bus Node Node Experimental equipment
Configuration DB, Archives, Storage Log files, etc. WAN LAN LAN Controller/ (LHC, Safety, ...) Other systems PLC VME Field Bus Node Node Experimental equipment Budgeting guidelines Central DCS Detector DCS
DETECTOR URD status Sept 02 … ITS TPC TRD TOF HMP PHO ZDC FD PMD MU EMC COS Detectors SPD SDD SSD RO FC CAL CPV FMD T0 V0 TRI TRA HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV LV LV ROD LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV COO subsystems COO COO COO COO COO COO COO COO COO COO COO COO COO COO FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS TS TS LIQ ALI LSR ECS draft URD exists Discussion started Not started DCS DAQ TRG OFF LHC DET GAS INF DSS MAG
NETW LAN FB INFRASTR. URD status Sept 02 ECS draft URD exists Discussion started Not started DCS DAQ TRG OFF LHC DET GAS INF DSS MAG ENV. PARAM ELECTR COOL ALIGN ACCES Subsystems PRIM RACK CRTE PRIM PLNT GAS SXL2 SXL1 ACR CR1 CR2 CR3 CR4 UX
PHO MU CAL CPV TRI TRA MIX MIX MIX MIX MIX MIX MIX MIX PUR PUR PUR PUR PUR PUR PUR PUR PMP PMP PMP PMP PMP PMP PMP PMP DIS DIS DIS DIS DIS DIS DIS DIS ANA ANA ANA ANA ANA ANA ANA ANA GAS URD status Sept 02 ECS draft URD exists Discussion started Not started DCS DAQ TRG OFF LHC DET GAS INF DSS MAG … TPC TRD TOF HMP PMD Detectors RO FC Modules
… ITS TPC TRD TOF HMP PHO ZDC FD PMD MU EMC COS Detectors SPD SDD SSD RO FC CAL CPV FMD T0 V0 TRI TRA HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV LV LV ROD LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV COO COO COO COO COO COO COO COO COO COO COO subsystems COO COO COO COO FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS TS TS LIQ ALI LSR DETECTOR Proto status Sept 02 ECS exists started Not started DCS DAQ TRG OFF LHC DET GAS INF DSS MAG
NETW LAN FB INFRASTR. Proto status Sept 02 ECS exists started Not started DCS DAQ TRG OFF LHC DET GAS INF DSS MAG ENV. PARAM ELECTR COOL ALIGN ACCES Subsystems PRIM RACK CRTE PRIM PLNT GAS SXL2 SXL1 ACR CR1 CR2 CR3 CR4 UX
PHO MU CAL CPV TRI TRA MIX MIX MIX MIX MIX MIX MIX MIX PUR PUR PUR PUR PUR PUR PUR PUR PMP PMP PMP PMP PMP PMP PMP PMP DIS DIS DIS DIS DIS DIS DIS DIS ANA ANA ANA ANA ANA ANA ANA ANA GAS Proto status Sept 02 ECS exists started Not started DCS DAQ TRG OFF LHC DET GAS INF DSS MAG … TPC TRD TOF HMP PMD Detectors RO FC Modules
PHO FD MU CAL CPV FMD T0 V0 TRI TRA DETECTOR SUB-SYSTEMS ECS DCS DAQ TRG OFF LHC DET GAS INF DSS MAG … ITS TPC TRD TOF HMP ZDC PMD EMC COS Detectors SPD SDD SSD RO FC HV1 HV1 HV1 HV2 HV3 HV2 HV1 HV1 HV1 HV1 HV1 HV1 HV1 HV1 HV1 HV1 HV1 HV4 HV? LV4 LV3 LV1 LV2 LV2 LV? LV2 LV? LV? LV? LV2 LV2 LV2 LV? LV2 LV2 LV? LV? subsystems COO B COO 1 COO B COO 2 COO 2 COO B COO B COO B COOB COO 3 COO ? COO B COO B COO B COO ? FEE FEE FEE FEE FEE FEE FEE FEE ? FEE ? FEE ? FEE ? FEE ? FEE ? FEE ? FEE FEE FEE ? FEE ? GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS TS TS LIQ ALI LSR ROD
DCS Planning • Global DCS planning exists
2002 03 04 05 06 07 DET PRE-INST FINALINST COM-MISS BEAMOP DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE SUB-DET CONTR. TEST WITH DETECTOR EQUIPMENT INSTALL DCS INFRASTRUCTURE INSTALL DETECTOR DCS DCS Planning
DCS Planning • Global DCS planning exists • Individual detector DCS planning missing • Input asked in each URD • Not many answers yet… • To start: • Simple Milestones list in excel form to complete • Then: • Microsoft project planning file
Milestones • User Requirements Document (URD) • Lab setup • Individual sub-system • Connection to PVSS, some panels, limited logging and configuration facilities • Intermediate detector tests & test beams • A few sub-systems involved • Subsystem as finite state machine • Pre-installation tests • All sub-systems involved • Extended logging, configuration and alarm facilities • Detector as finite state machine • ECS and liaisons with DAQ, TRG • Final installation • Commissioning
TPC Milestones ex. HV LV CO LA … • URD Jan 02 Jan 02 Mar 02 Jun 02 … • Lab setup Apr 02 May 02 Jun 02 ? … • detector tests Mar 03 Mar 03 Mar 03 ? • Pre-inst. Tests Apr 04 Apr 04 Apr 04 ? • Final installation Jun 05 Jun 05 Jun 05 ? • Commissioning Sep 06 Sep 06 Sep 06 Sep 06
Goals for end 2002 • URD’s • A 1st version from all remaining detectors • Existing URD’s updated to cover • All sub-systems • Operational requirements: state/transition diagrams • for sub-systems • For ECS: exp. Modes and actions for DCS, DAQ, TRG • Interlocks • Planning: milestones table • Budget: Central DCS and Detector DCS estimate
Goals for end 2002 • Prototyping • Common solutions (ACC team) • CAEN 1527 available in PVSS FW + lab setup • ISEG HV available in PVSS FW + lab setup • Wiener PL500 available in PVSS FW + lab setup • 1st proto Temp monitoring system + lab setup • Detectors • Start using PVSS FW and one common solution • Make a Lab Setup
Conclusion • URD’s are advancing well – 2nd version now needed • Prototyping is just starting • DCS to be ready for each detector in less than 3 years (mid 05) • A realistic planning of these 3 years is essential • Detector tests to be used as milestones for the DCS planning • Intermediate steps to be detailed for each sub-system