Iso view of shielding in place. Lifting beam with adjustable pick point Matches the pitch of the shield to the pitch of the hall. slides. Secures pick point to set position. Strength of M20 fasteners. 2xM20. Rx. Ry. Reacts against the 10mm step of the inner ring. 2663. 875.
E N D
Lifting beam with adjustable pick point Matches the pitch of the shield to the pitch of the hall. slides Secures pick point to set position
Strength of M20 fasteners 2xM20 Rx Ry Reacts against the 10mm step of the inner ring 2663 875 2750kg (6050lbs) FS=5.5 w/o 10mm step and nofriction Rx
View o f the external side of the YE-4 inner. The cables and flexible gas and water lines will be disconnected from the IP side of the YE4-outer so it can be moved with the YE4 wall. Are the cables and flexibles flexible enough to tie back to the external side so that they are not damaged when the shield is installed on the IP side?
Base for guide is left in place on the disk. The guide post slides into base and is secured with a quick release pin Base Guide Weight is approximately 10 pounds (5 kg) Rated side force is approximately 310 lbs(140kg)
ISO view of shielding assembly For guiding into position over beam- pipe Removable third leg for setting on the floor Linear slide for bottom lead plates
End view of shielding in place. It will be a challenge to reach the top mount point to secure the shield, but I believe it is doable with the bottom corner of the cherry picker located as indicated. Bottom corner of cherry picker
Top mount can be left in place if a small amount of spacer ring shielding is removed from the YE1 spacer ring Adapter for mounting on YE3 Top mount point on YE2
Base for guide is left in place on the disk. The guide post slides into base and is secured with a quick release pin Base Guide