80 likes | 187 Views
RWH SYNTHESIS PAPER. Leading Institution: UEM/FAEF. by Paiva Munguambe Alex Mhizha; Bongani Ncube; Cláudio Julaia; Esther Masvaya; Isaiah Nyagumbo; John Dimes; Mário Chilundo; Muchaneta Munamati ; Oswin Madzonga; Sue Walker; Sylvester Mapandeli; Walter Mupangwa;. Final Scientific Workshop
E N D
RWH SYNTHESIS PAPER Leading Institution: UEM/FAEF by Paiva Munguambe Alex Mhizha; Bongani Ncube; Cláudio Julaia; Esther Masvaya; Isaiah Nyagumbo; John Dimes; Mário Chilundo; Muchaneta Munamati; Oswin Madzonga; Sue Walker; Sylvester Mapandeli; Walter Mupangwa; Final Scientific Workshop JHB, 15-18th June 2009
Title Rainwater Harvesting to Cope with Climate Induced Risks in Smallholder Farming Systems in the Limpopo Basin
Agreed Outline Section I:INTRODUCTION (Paiva; Bongani; Walter & Sylvester) Section II: The NEED for RWH Techniques (Bongani, Paiva & Walter) Section III: EXISTING TECHNOLOGIES and PRACTICES of RWH Techniques (Paiva; Walter & Isaiah; Sylvester)
Agreed Outline… Section IV: EVALUATION of the EXISTING RWH Techniques (Walter & Isaiah; Paiva) Section V: NEW APPROACHES of RWHT (Julaia; Walter; Manuel & Bongani) Section VI: GAPS and WAY FORWARD (John, Sue Walker & Bongani) Acknowledgements References
RAINFALL SYNTHESIS PAPER (Mozambique, South Africa & Zimbabwe) Rainfall Risk Analysis for Rainfed Agriculture in the Limpopo Basin Walter, Sue, John, Manuel, Paiva? David?
Introduction • Rainfed farming • Crop water requirements • Rainfall seasonal distribution • Probabilities/chances/frequencies Materials and methods • Map of the basin • Rainfall data sources ( at least 2 stations per country) • Instat • SPI Results and Discussion (compare 3 catchments) • Maize water requirements • Rainfall amounts (CDFs) • Start and end of rain seasons • Frequencies • Dry spell probabilities • Drought – SPI • Compare maize and sorghum for all 6 stations for the above criteria Conclusion and recommendations Possible Journals: Agriculture, Environment and Ecosystem / (Met Appl./J. Arid Environments)
Deadlines • Country’s contribution due by 25th June 2009 • Leading Institution 1st Draft due by 30th June 2009 • Comments from partners due by 3rd July 2009 • Circulating Final draft by 6th July 2009 • Submission of Final draft by 7th July 2009