1 / 16

A Centralised Management Tool for Quality Indicators in EUSTAT

A Centralised Management Tool for Quality Indicators in EUSTAT. Jorge Aramendi, Anjeles Iztueta, Cristina Prado, Marta Mas EUSTAT. Basque Statistics Office. Helsinki, 4 May 2010. Where the Basque Country is & What Eustat is. The Basque Country is in the Northern part of Spain.

daryl-lara
Download Presentation

A Centralised Management Tool for Quality Indicators in EUSTAT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Centralised Management Tool for Quality Indicators in EUSTAT Jorge Aramendi, Anjeles Iztueta, Cristina Prado, Marta Mas EUSTAT. Basque Statistics Office Helsinki, 4 May 2010

  2. Where the Basque Country is & What Eustat is • The Basque Country is in the Northern part of Spain. • An autonomous agency set up pursuant to the 1986 Basque Statistics Act. • Headquarters are located in Vitoria. Provincial offices are in Bilbao, San Sebastián and Vitoria.

  3. Index • Eustat Quality System • Origin and definition of the project. HOBETU • Proposed indicators • Indicator attributes • Task distribution • Minimum indicators • Results • Future approach

  4. Eustat Quality System EUSTAT PLANS EFQM MODEL STATISTICAL OPERATIONS Strategic Plan 2. Strategy 1. Statistical Operation Technical Projects Marketing Plan and Dissemination Indicator Registries 3. Annual Programme and Audit 4. Marketing Services Charter 5. Continuous Improvement 6. Administration Quality report Training plan 7. Information and Communication Systems 8. Human Resources Quality Reports on Data Collection Equality Plan 9. Knowledge Management Commitment to Basque Language Plan

  5. Defining the project • Organisational problems due to information dispersion • Need for centralisation • Tool: HOBETU

  6. Defining the project • Over 100 statistical operations. • Source of the information • Statistical Operation Indicator Registry • Quality reports • Technical Projects • Quality Report on Data Collection • Problems detected • Indicator integration • Ranks, units, calculation, registry, periodicity,... • Quality reports that are not comparable. • Redefining: Uniformity and standardisation of indicators

  7. Proposed indicators • Realistic approach: availability, utility, calculable, work load. • Common to all operations • Part of the quality report • Interesting for the organization • EUROSTAT quality factors • 4 of Relevance, 2 of Opportunity & Punctuality, 2 of Comparability, 3 of Accessibility & Clarity, 5 of Accuracy and Reliability, 1 of Costs and 1 of Geographical Scope • Indicator bank for the whole organization

  8. Indicator attributes • Name • Definition • Calculation Method • Measure • Unit responsible for carrying out the work • Periodicity • Data source • Registered value • Reference value • Target value • Compliance • Quality factor • Quality report

  9. Task distribution • Centralised workload: • Current value: Website Hits, Media Hits, Satisfaction Index, Level of Importance, Total Cost. • Reference Value of all indicators. • Unit Responsible for Operation: • Current Value and Target Value: Schedule Compliance, Time Lag, Comparability Rate, Comparable Periods, Methodological Documents Disseminated Online, Publications Disseminated, Nº of Clicks to Access Information, Geographical Disaggregation, Response Rate, Coverage Rate and Sampling Errors. • Target Value (Annual): Website Hits, Media Hits, Satisfaction Index, Level of Importance, Total Cost and Preparation Time.

  10. Minimum indicators

  11. Summary • HOBETU tool that centralises management of the indicators • Coherence • Comparability • Assessment tool • Quality reports • Compliance reports

  12. Future approach • Register all the indicators of the EUSTAT’s quality system • EFQM processes • Institutional plans

  13. Thank you Jorge Aramendi EUSTAT. Basque Statistics Office j-aramendi@eustat.es

More Related