AcadPV 10 kWp PV grid-connected system in Sofia,BG. CL SENES – Sofia,BG. EC Project: PV Enlargement. Sofia Meeting 30 June. Solar Potential:. CL SENES – Sofia,BG. Location: CL SENES Building LA: N 42 o 42.399’ LO: E 23 o 18.830’ ALT: 551 m. Sofia
E N D
AcadPV10 kWp PV grid-connected system in Sofia,BG CL SENES – Sofia,BG EC Project:PV Enlargement Sofia Meeting 30 June
Solar Potential: CL SENES – Sofia,BG Location: CL SENES Building LA: N 42o 42.399’ LO: E 23o 18.830’ ALT: 551 m Sofia Meeting 30 June
Electrical scheme: CL SENES – Sofia,BG Sofia Meeting 30 June
Expected Performance: 10 kWp PV =>13.2 MWh/ yr CL SENES – Sofia,BG Sofia Meeting 30 June EC Joint Research Centre - ISPRA, Italy
Design & Construction Aim: High Visual Impact CL SENES – Sofia,BG Sofia Meeting 30 June
CL SENES – Sofia,BG Design & Construction: Final Vision Sofia Meeting 30 June
Solar Generator: 10 kWp installed power CL SENES – Sofia,BG Sofia Meeting 30 June
CL SENES – Sofia,BG PV Inverters & DC Wiring: Grid connection Sofia Meeting 30 June
Current Status:Meteo Data CL SENES – Sofia,BG Sofia Meeting 30 June
Current Status: PV system Performance PV module: Readout 128 W CL SENES – Sofia,BG PVsubfield2:Readout 2666 W Sofia Meeting 30 June
Software Control Menus: PV system Configuration CL SENES – Sofia,BG MPPTracking Range Sofia Meeting 30 June
Main Results : 10 kWp PV array Control Electrometer Readings 1st day of operation - 37 kWh/ day 1st month of operation - 1210 kWh/ month CL SENES – Sofia,BG Typical performance: ( PV subfield 2 - 3,3 kWp) Solar Generator : SP 3100-600 Inverter: SG Voltage: 317.2 V AC Voltage: 216.7 V SG Current: 8.94 A AC Current: 12.31 A Peak Readings: P max : 3132 W , V oc : 408.0 V, V MPPT : 318.3 V Sofia Meeting 30 June
Current Problems: DL100 Data logger Communication CL SENES – Sofia,BG Inverter Disconnection due to AC Grid Failure Sofia Meeting 30 June
Local Grid Profile: CL SENES – Sofia,BG Sofia Meeting 30 June
Future Tasks:DAS installation, Seasonal Monitoring CL SENES – Sofia,BG Sofia Meeting 30 June
Conclusions: * 10 kWp PV system has been installed in BG * PV installation is connected to Low Voltage Public Grid * Excellent Performance and Trouble-free Operation * High Visual Impact CL SENES – Sofia,BG Sofia Meeting 30 June