1 / 21

FEMA Region II Morris County Digital Flood Insurance Rate Map (DFIRM)

FEMA Region II Morris County Digital Flood Insurance Rate Map (DFIRM). FEMA Region 2 Mitigation Division April 28th, 2010 10:00-11:00 or 14:00-15:00.

daw
Download Presentation

FEMA Region II Morris County Digital Flood Insurance Rate Map (DFIRM)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FEMA Region IIMorris County Digital Flood Insurance Rate Map (DFIRM) FEMA Region 2 Mitigation Division April 28th, 2010 10:00-11:00 or 14:00-15:00

  2. Purpose of this Coordination Call: To establish the awareness and understanding in the ongoing collaborative efforts to update Community’s flood risk analysis and mapping (ie. FIS and DFIRM). • Whois Involved: TEAM comprised of Federal/State/Local/Contract Partners - • Federal – FEMA, Region II Project Manager; Paul K. Weberg, PE Communications/Outreach Support; Adie Koby Technical Assistance; Alan Springett • Engineering Contacts: Regional Support Center (RSC2); Andrew Martin, Tolga Yilmaz Regional Program Management Lead (RPML); Bo Juza Map Mod Mapping Partner; NTHMC – Roger Kowieski, PE Risk MAP Mapping Partner; RAMPP, JV – Robyn Boyd • State – NJDEP, Joseph Ruggeri, P.E., CFM Supervising Engineer NJ State NFIP Coordinator's Office Bureau of Dam Safety & Flood Control Office of Engineering & Construction • Local – Morris County & Communities Purpose

  3. WHY: maintain an up-to-date and accurate flood risk analysis and delineation for local decision makers in flood risk management. • This SUCCESS of this effort and outcome relies on the active participation of EACH COMMUNITY Purpose

  4. Overview of current DFIRM mapping status of Morris County • Future projects and next steps • QA/QC & Feedback from the communities Objective

  5. Mapping partner to deliver countywide preliminary maps to Morris communities Friday, April 30th 2010 • Preliminary DFIRM Project Team • NTHMC, Inc. • AECOM • Preliminary DFIRM Tasks -Base Map Acquisition -Redelineation -New Detailed Hydrology & Hydraulics (H&H) -FIS Report Production -Terrain data processing -DFIRM panel and database production -Preliminary DFIRM Production and Distribution Current Status of Morris County DFIRM Mapping

  6. Preliminary DFIRM Scope of Work: The selection of study streams were primarily driven by a severe flooding of August 11-14, 2000, which impacted several areas in Morris, Sussex, and Hunterdon Counties. This flooding was well documented in the USGS WRI Report 02-4099, which was reviewed by NTHMC and discussed with FEMA, USGS and NJDEP Morris County – 4/30/2010 Preliminary DFIRMs

  7. Morris County – 4/30/2010 PreliminaryNew Detailed Studies

  8. Re-delineation • 69 streams, 370 miles of detailed study reaches • 73 streams, 111 miles of approximate 1% annual-chance floodplains • Using updated digital topography (LIDAR collected in 2005) provided by the Morris County, The Department of Planning, Development, and Technology, GIS Department Morris County – 4/30/2010 PreliminaryRe-delineation

  9. Morris County – 4/30/2010 PreliminaryStudied Streams

  10. Morris County – 4/30/2010 PreliminaryFlood Hazard Areas

  11. Converts the existing manual format flood maps to a GIS-based digital format • Includes a Digital FIRM Database • Updates the base map to 2005 orthophotography • Converts flood hazard data from the National Geodetic Vertical Datum of 1929 (NGVD 29) to the North American Vertical Datum of 1988 (NAVD 88) • NAVD 88 = NGVD 29 (–0.78) Morris County – 4/30/2010 PreliminaryMap Modernization

  12. Discrepancies in the 100-year water surface elevations between adjacent communities (15 out of 39 Municipalities) • Missing delineations between adjacent communities (gaps in the delineations) Morris County – 4/30/2010 PreliminaryProblems Encountered

  13. Morris County – 4/30/2010 PreliminaryProblem Area Examples

  14. The 100-year floodplain elevation at the corporate limit between Morris Plains and Parsippany-Troy Hills has an elevation drop of approx. 2 feet Borough of Morris Plains BFE: 450 Township of Parsippany-Troy Hills BFE: 448 Morris County – 4/30/2010 PreliminaryProblem Area Examples

  15. Pequannock River, Riverdale Borough - The bridge going over Interstate 287 is not located on the flood profile Morris County – 4/30/2010 PreliminaryProblem Area Examples

  16. New mapping partner (RAMPP) to start revising and deliver revised preliminary maps on June, 2011 Revised Preliminary DFIRM Scope of Work: • Approximately 31 miles of detailed analysis for various streams due to mismatches found during the first-time countywide mapping effort • 14 miles of detailed analysis for the Passaic River Revised Preliminary DFIRM Current Status: • Field survey for the approximately 31 miles of detailed analysis for various streams has been completed • Awaiting the completed survey of the 14 miles of the Passaic River project and also to obtain the preliminary countywide mapping data Morris County - Future WorkRevised Preliminary

  17. Morris County - Future WorkNew Detailed Studies

  18. Morris County - Future WorkNew Detailed Studies

  19. Morris County - Future WorkNew Detailed Studies

  20. 6 month: FEMA 6-month LFD Letter • 5 month: NJDEP Assistance Letter • 3 ½ month: Draft Ordinance • 3 month: NJDEP review of draft ordinance • 3 month: FEMA 90-day Reminder Letter • 1 month: FEMA 30-day Reminder Letter • 0: Ordinance Adopted The Road to Ordinance Re-Adoption

  21. Contact Information • FEMA Region II Paul Weberg, DHS/FEMA Region II 290 Broadway, 29th Floor New York, NY (212) 680-3638 Paul.weberg@dhs.gov • NJDEP office: John Scordato / Joseph Ruggeri / Chris Gould / NJDEP, Bureau of Dam Safety & Flood Control (609) 292-2296 phone, (609) 984-1908 fax Visit NJDEP website: www.nj.gov/dep/floodcontrol Download Model Ordinances: http://www.nj.gov/dep/floodcontrol/modelord.htm Questions & Feedback

More Related