360 likes | 492 Views
Ethiopian Rural Travel and Transport Program Manuals. Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works-Community Roads of the Productive Safety Net Program (PSNP). ERTTP Manuals. Formulation & Implementation Framework
E N D
Ethiopian Rural Travel and Transport Program Manuals Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works-Community Roads of the ProductiveSafety Net Program (PSNP)
ERTTP Manuals • Formulation & Implementation Framework • Planning Monitoring & Evaluation • Rural Transport Infrastructure Development • Means Of Transport & Service Development • Non-Transport Interventions & Income Generating Schemes • Resource Mobilization & Management
Table of Contents ABBREVIATIONS and ACRONYMS vi I.Preface vii I.1.Background vii I.2.Objectives vii I.3.Organization of the manual viii
Chapter 1.ORGANIZATION AND PLANNING 1.1.Community Organization and Participation 1.2.Working with Community 1.3.Planning of Project 1.4.Operational Planning 1.4.1.Logistic Planning 1.4.2.Work Planning 1.4.3.Overall Work Plan
Chapter 2.RTI Design Standard, Wereda Mapping And Pricing 2.1. RTI Traffic Survey Method 2.2. Wereda RTI Mapping 2.3. Low Level Road Design 2.4. Quantity Estimation and Pricing 2.5. Environmental Impact Assessment 2.6. Safety
Chapter 3.Guideline on RTI Construction and Improvement More detail in a moment
Chapter 3.Guideline on RTI Construction and Improvement 3.1.Setting-Out (Route Alignment) 3.2.Sequences of Construction Activities 3.3.Improvement of Footpaths 3.4.Retaining Structures 3.5.Hand Tools and Simple Implements 3.6.Construction of Different Types of Cross Drainage Structures
Chapter 4.RTI Maintenance 4.1. Maintenance Purpose and Causes of Road Deterioration 4.2. Maintenance Need Assessment 4.3. Type of road and structure maintenance 4.3.1. Routine maintenance 4.3.2. Periodic Maintenance 4.3.3. Emergency Maintenance
Chapter 5. Construction and Maintenance by Contractor 5.1. Introduction 5.2 Contract Administration 5.3 Procurement of Works 5.4 Community Contracting
Chapter 3.Guideline on RTI Construction and Improvement • Execution of road construction and tracks and footpaths improvement • Guides the woreda technician • Arrangements for the execution of works and the preconditions to fulfil indicated • Details on the sequence of road construction.
Chapter 3.Guideline on RTI Construction and Improvement • Pictorial presentations & illustrations for ease of understanding • Design & construction of drainage systems & footbridges • Methods for improving the existing tracks & paths
Chapter 3.Guideline on RTI Construction and Improvement 3.1.Setting-Out (Route Alignment) 3.2.Sequences of Construction Activities 3.3.Improvement of Footpaths 3.4.Retaining Structures 3.5.Hand Tools and Simple Implements 3.6.Construction of Different Types of Cross Drainage Structures
Table 3.9 Spacing of turnout ditches according to the slope of the ditch • *If exceeded, scouring will occur • **If exceeded, silting will occur
Chapter 4.RTI Maintenance 4.1. Maintenance Purpose and Causes of Road Deterioration 4.2. Maintenance Need Assessment 4.3. Type of road and structure maintenance 4.3.1. Routine maintenance 4.3.2. Periodic Maintenance 4.3.3. Emergency Maintenance
Pot-hole & Rut Repair Steps
Training of Trainer Personnel on Environmentally Sound Design andImplementation of Public Works-Community Roads of the ProductiveSafety Net Program (PSNP) June 13-24, 2011 GhionAmbassel Hotel Dessie, Ethiopia