LYON, 30 NOV 2007 Wp 2 Monitoring. Grupo de Energía y Edificación (GEE) Universidad de Zaragoza. WP 2. WP 2.1. Integrated energy networks. Performance Management and Modelling. WP 2.2. Ecobuildings: quality control & performance analysis. WP 2.3. Common monitoring and analysis. KEY POINTS.
E N D
LYON, 30 NOV 2007 Wp 2 Monitoring Grupo de Energía y Edificación (GEE) Universidad de Zaragoza
WP 2 • WP 2.1. Integrated energy networks. Performance Management and Modelling. • WP 2.2. Ecobuildings: quality control & performance analysis. • WP 2.3. Common monitoring and analysis.
KEY POINTS • The plan • Activities during 2007. • Encountered problems. • Planned activities for next year.
THE PLAN GETTING DATA POINT OF DEPARTURE We are here PLOTS REFLECTING FINAL STEPS
KEY POINTS • The plan • Activities during 2007. • Encountered problems. • Planned activities for next year.
ACTIVITIES (WP 2.1) • 1) Definition of technical specificatations for the monitoring sensors. • TEMPERATURE • Accuracy: 0,5ºC • RELATIVE HUMIDITY • Accuracy: 1% • REGISTRATION PERIOD • Value registred every sec: • statistic average every 10 min • LON-WORKS PROTOCOL
ACTIVITIES (WP 2.1) • 2) Selection of monitoring variables: MICROCLIMATE in Valdespartera
ACTIVITIES (WP 2.1) • 2) Selection of monitoring variables: CONFORT inside buildings • P12, P13, P17, P18; Neighbours informed by the SMRUZ. • P14, P24, P27, P21; Neighbour informed as a result of meetings with the community administrators. • P29, P20, Information phase.
ACTIVITIES (WP 2.1) • 2) Selection of monitoring variables: ENERGY CONSUMPTION
ACTIVITIES (WP 2.1) • 3) Digital network to transfer DATA to the DEMONSTRATION CENTER
W.P. 2.2 • 1) Assistance to constructors during the construction phase • Parcela 14 • Colocar antepecho • Cambiar la tonalidad de cristales Solución propuesta con triple practicabilidad y antepecho asegurado con barandilla incorporada en carpintería. Asegurar 50% practicabilidad 60% mín invernaderos en sur +-45º (Stranslúcido=Stransparente/2;Sopaco=0)
W.P. 2.2 • 1) Assistance to constructors during the construction phaseParcela 29 • Cambio del aislante de fachada • Cambio carpintería doble por simple con cristales de baja emisivilidad. (Uanterior=2.4>Uactural con bajo emisivo) Composición fachada proyectada Composición nueva fachada
ACTIVITIES (WP 2.2) • 2) Pictures gallery including good & bad practices in construction.
ACTIVITIES (WP 2.2) • 3) PICARRAL: thermographic study of existing buildings and simulations of refurbishment.
ACTIVITIES (WP 2.2) • 4) Blower door test in Picarral.
KEY POINTS • The plan • Activities during 2007. • Encountered problems. • Planned activities for next year.
PROBLEMS (WP 2.1) • 1) Rejection of some neighbours • (actual legal framework force occupation 6 months after key delivery) • 2) Extra-cost of connection digital network --- monitoring system inside buildings and equipment (in part compensated with external apport and other partners apport -SM
KEY POINTS • The plan • Activities during 2007. • Encountered problems. • Planned activities for next year.
FORESEEN ACTIVITIES 2008 • Go on with sensors installation along with new building constructions. • First tests of digital data collecting systems in P12
FORESEEN ACTIVITIES 2008 • Zaragoza will prepare the first layout by January 2008 defining: • Comfort controls (what, where, how many…) • Energy consumption (different values: HDW, Heating, Air conditioning, Electric consumption concerning lighting, electro-domestic devices…) • Definition of standard conditions for climate and comfort (local values) • Reduction to standard comfort conditions and standard climate: new energy consumption: kwh/m2-año • Identification of difficulties (technical, economical, social…)
FORESEEN ACTIVITIES 2008 • Digital network ready and connected to MICROCLIMATE, COMFORT & ENERGY CONSUMPION METERS. • DEMONSTRATION BUILDING FINISHED & collecting & showing system installed.
FORESEEN ACTIVITIES 2008 • EVERYTHING SHOULD BE READY by the end of next year TO START MONITORING DATA COLLECTION: • minimum period of monitorization: • 2009-2010 !!!!!!