70 likes | 155 Views
Mantychore Nov 2010 WP 7. Andrew Mackarel. Scope of WP 7.
E N D
Mantychore Nov2010WP 7 Andrew Mackarel
Scope of WP 7 • MANTYCHORE-GSN collaboration has the objective to design necessary experiments and tests which eventually check the viability of the movement of services (virtual machines (VMs and applications) using flexible device configuration utilities such as Infrastructure as a Service and Bandwidth on Demand solutions. • Perform the integration between GSN and MANTYCHORE (physical integration between the GSN and the NRENs infrastructure and also the services integration).
GSN Node & Network • GSN / Mantychore Integration team meetings active focusing on • Test Case Generation • Solution Integration requirements and benefits analysis • Training
Backup Slides
i2CAT GSN Green Node • i2CAT Rural Node Plan: • Rural location • Connectivity via a radiofrequency link. • Solar Panel setup • Capacity: 2000W • Dual switch / Power Device Unit configuration • Green Power for experimentation • Regular grid for maintenance and operation