Progress Meeting 4 4 th May 2011 ESA-ESRIN

Progress Meeting 4 4 th May 2011 ESA-ESRIN. Timeline. Phase 1 Formally approved Phase 2 Started Jan 1 st 2011. Progress Meeting 4 on May 4 th , 2011 UCM-2 on 5-6 October, 2011 at NMCI in Cork, Ireland Planned Finish on 31 st December, 2011 Phase 3

delora
Download Presentation

Progress Meeting 4 4 th May 2011 ESA-ESRIN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress Meeting 4 4th May 2011 ESA-ESRIN

  2. Timeline • Phase 1 • Formally approved • Phase 2 • Started Jan 1st 2011. • Progress Meeting 4 on May 4th, 2011 • UCM-2 on 5-6 October, 2011 at NMCI in Cork, Ireland • Planned Finish on 31st December, 2011 • Phase 3 • Planned Start on Jan 1st 2012 . • PM6 in May 2012, exact date TBD • UCM-3 in October 2012, venue and exact date TBD • Planned Finish (and end of project) on 31st Dec 2012

  3. PM4 Deliverables • D.8– Online tools for MDB(demo at PM4 and final release in June) • D.12 – Global Wave Statistics • D.13 – 4 months operations of NRT Data • D.14 – Verbal update on demonstration products status • D.17 – 1st Quarterly L2P Quality Control Report • D.21 – 2 Monthly Operational PS-WFVS reports • D.24 – 3rdGlobWave Newsletter

  4. Plan – Deliverables Required by end of Phase 2 • D.8 – Online tools for MDB (JF, June/11)) • D.9 – Handbook (EA+FC, July/11). • D.21 – PS-WFVS: GlobWave DDS (July/11), Report on first year of operation (Dec/11), and 11 monthly reports (Dec/11) (HS+DP) • Merged Altimeter product (JF, July/11) • D.17 – 2nd, 3rd and 4th Quarterly L2P Quality Control Reports (EA+FC, July-11/Oct-11/Jan-12) • D.24 – 4th GlobWave newsletter (GB+EP, Oct/11) • D.25 – Minutes of the 2nd UCM, Nov/11 (GB+EP) • D.26 – Recommendations of the GlobWave Steering Team (Nov/11, GB+EP) • D.28 – Annual User Assessment, Phase 2 (Nov/11, GB+EP) • D.6 – L2P Product User Guide, Phase 2 rev (EA+FC, Dec/11) • D.13 – L2P satellite wave data, 12 months of NRT operations (JF, Dec/11) • D.14 – Demonstration Products (GB, Dec/11) • D.18 – 1st Annual L2P Quality Control Report (EA+FC, Dec/11)

  5. Possible Demonstration Products • Climatology Demo Product (Liz Kent, NOC) • GNSS-R retrieval of sea state related parameters (Martin Unwin, SSTL) • Radarsat Wave Retrievals (Will Perrie, DFO-MPO) • Coastal Altimetry (Jerome Benveniste, ESA) • Cross Seas Demo Product (Fabrice Collard, CLS)

More Related