Clever Planetarium Preservation Project Proposal

Board of Trustees Meeting November 20, 2012. Clever Planetarium Preservation Project Proposal. History / Background. On May 15, 2012 Board of Trustees authorized Administration to pursue a feasibility study and cost analysis to retain the current planetarium

denna
Download Presentation

Clever Planetarium Preservation Project Proposal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Board of Trustees Meeting November 20, 2012 Clever Planetarium Preservation Project Proposal

  2. History / Background • On May 15, 2012 Board of Trustees authorized Administration to pursue a feasibility study and cost analysis to retain the current planetarium • On August 21, 2012 Administration presented results of the feasibility study and cost analysis and recommended to: • Retain the entire two story Planetarium building • Retain classrooms 101, 102, and 205 • Provide new elevator

  3. Proposed Cost Estimate • Project Budget $5M • Includes: • Construction budget $2.95M • Architect fees • Structural, Electrical, Mechanical, & Civil Engineering fees • DSA fees • Project Management, etc.

  4. Update • The state funding of the Cunningham Science and Mathematics Replacement Project includes the demolition of the Cunningham building • Administration has conferred with the Chancellor’s Office who has requested a written proposal to retain the two story Planetarium building • The Final Project Proposal (FPP) approved by the State in 2008 included an 80 seat planetarium and 2 classrooms yet remains unfunded

  5. Proposed Area to Retain

  6. Floor Plan - First Floor PLANETARIUM ELEVATOR CLASSROOM CLASSROOM C101 & C102 FTES in 2011-12 = 164.2

  7. Floor Plan – Second Floor PLANETARIUM ELEVATOR CLASSROOM

  8. Partial Site Plan

  9. Recommendation • Proceed with the Planetarium Preservation Project; and • Submit a written proposal to the Chancellor’s Office excluding the Clever Planetarium and classrooms 101, 102, and 205 from the demolition of the Cunningham building; and • Withdraw the approved 2008 Final Project Proposal (FPP) for a new planetarium.

  10. Recommended Funding • Approve $5 million from Measure L Bond Contingency • Contingency balance as of September 30, 2012: $15,170,585 • Estimated savings from existing projects returned to contingency: $2,750,000 +/- • Estimated Contingency funds available: $17,920,585

  11. Further Recommendation • Budget annual costs from the General Fund, starting in 2013-2014 • Planetarium Tech/Coordinator:$60,300 • Marketing budget:$10,000 • Collaborate with faculty to create curriculum and programs to use the planetarium as a lab/lecture space