Overview of PoA Standards

Overview of PoA Standards. SDM JOINT COORDINATION WORKSHOP Bonn, Germany, 24-25 March 2012. Background. (Decision 3/CMP.6 paragraph 4) the Board to reassess its existing regulations related to PoAs to:

depalmar
Download Presentation

Overview of PoA Standards

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, 24-25 March 2012 Wenxin Li, Programme Officer

  2. Background • (Decision 3/CMP.6 paragraph 4) the Board to reassess its existing regulations related to PoAs to: • Further clarify the application of existing rules regarding the demonstration of additionality and the definition of eligibility criteria; • Simplify the application of multiple methods and technologies; • Standard for demonstration of additionality, development of eligibility criteria and application of multiple methodologies for programme of activities (EB65 , Annex 3) • Standard for sampling and surveys for CDM project activities and programme of activities (EB65, Annex 2) 2

  3. Section III.A - Requirements for Additionality • Additionality shall be demonstrated by establishing that in the absence of CDM, none of the implemented CPAs would occur. • If a large scale methodology • Additionality section of the large scale methodology • If a small scale methodology and small scale projects • Attachment A of Appendix B of the “Simplified modalities and procedures for small-scale CDM project activities” • If a small scale methodology and microscale projects • “Guidelines for demonstrating additionality of microscale project activities” 3

  4. Section III.B - Requirements for Eligibility Criteria • CME develop EC (minimum categories, verifiable) • DOE assess EC (objective and comprehensive) • CME implement a mangement system • DOE assess the elements • Update of eligibility criteria • Revision of methodologies after being placed on hold • Amendment of PoA boundary • Initiated by the Board • At the renewal of crediting period 4

  5. Section III.B - Requirements for Multiple Methodologies • Cross effects refer to the interactive effects between the technology(ies)/measures of a CPA. • Demonstrate no cross effects, otherwise, request for deviation. • One/multiple measures/technologies with one/multiple SSC methodologies • Multiple LS methodologies or SSC+LS methodologies • Allowed in the methodologies • Request for clarification 5

  6. Sampling Standard - Requirements for PoAs • Sample size calculations • Required Reliability: i.e. Confidence / Precision • The type of parameter of interest: proportion or mean value • The expected value and variance (or standard deviation) of the parameter • PoAs • Allows a single sampling plan covering a group of SSC CPAs • More rigorous confidence/precision (i.e. 95/10). • Validation and verification of sampling plans 6

  7. Next steps in 2012 • Annexes to the sampling standard to provide best practice examples (Q2 2012, Q3 2012) • Assessment report on cross effects when applying multiple methodologies to PoA and possible development of guidance (Q3 2012) • Revised large-scale methodologies to include PoA provisions (Q3 2012) • Assessment report of stakeholder inputs and possible revision of PoA guidance (Q3 2012)

  8. Thank you for your attention! 8