1 / 10

Implementation of PoA standards The point of view of a DOE

Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25 March 2012. SUMMARY. PRESENTATION OF AENOR PoA EXPERIENCE MAIN ISSUES ON PoA VALIDATION NEW PoA STANDARD EB 65

Download Presentation

Implementation of PoA standards The point of view of a DOE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Implementation of PoAstandards Thepoint of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25 March 2012

  2. SUMMARY • PRESENTATION OF AENOR • PoA EXPERIENCE • MAIN ISSUES ON PoA VALIDATION • NEW PoA STANDARD EB 65 • OPPORTUNITIES

  3. PRESENTATION OF AENOR • AENOR = ASOCIACIÓN ESPAÑOLA DE NORMALIZACIÓN Y CERTIFICACIÓN (SPANISH ASSOCIATION FOR STANDARDIZATION AND CERTIFICATION) • AENOR: Spain + 12 branchoffices in Europe, Africa and America • Non profitableassociation • Standardizationbody of Spain + certificationcompany

  4. PoA EXPERIENCE • Validation of 17 Poas • 2 registered: waste compost programme (Uganda); Turbococinas (El Salvador) • 1 PoArequestingregistration (energyefficientlighting, Senegal) • 14 validationongoing • Sectoralscopes: 1; 3; 13; 15.

  5. PoA EXPERIENCE

  6. MAIN ISSUES ON PoA VALIDATION • Eligibilitycriterianotenoughclearordetailed • Demonstration of additionalityisbasedonopinions, non onsubstantiatedfacts • CPA starting date is not in accordance with requirements • Additionality and eligibility • Someeligibilitycriteria are notverifiable

  7. MAIN ISSUES ON PoA VALIDATION • Monitoring plan isnotdetailed and itis non describedaccordingtotheProcedureforRegistration of a programme of activities as a single CDM project activity. (EB 55 annex 38) (sampling vs. surveys) • Guidelines on the assessment of investment analysis is not properly and completely explained. • Emission Factor: PoA-DD does not specify if the EF is fixed ex ante or each CPA will use its own Emission Factor.

  8. NEW PoA STANDARD EB 65 • Eligibilitycriteria: “Validating DOE and/or the Board may specify additional criteria depending on the specific characteristics of a PoA”. • The CME shall develop and implement a management system • The revision of eligibility criteria of a registered PoA may be initiated by the Board at any time during the lifetime of the PoA if an issue related to environment integrity is identified. • Application of multiple CDM methodologies (…) Combinations of technologies/measures and methodologies vary across CPAs of a PoA.

  9. OPPORTUNITIES • Furtherclarificationonadditionality • New proceduresfor CPA withdrawal • DOE liability Future

  10. Thankyouverymuchforyourkindattention Luis Fernando Robles Olmos Head, ClimateChangeUnit AENOR E-mail: lrobles@aenor.es

More Related